System and method of generating and implementing outputs for a drilling rig using a well construction knowledge mining system based on well construction data
Abstract
A system and method of building a well construction knowledge mining system using an artificial intelligence ("AI") model and a plurality of databases, the method comprising: accessing, within the plurality of databases, a set of well construction files; wherein the set of well construction files comprise files in a plurality of formats; and wherein the set of well construction files comprise data relating to well construction operations; preprocessing the set of well construction files to generate a training data set, comprising: reformatting at least a portion of the data to standardized machine-readable data; labeling data in the machine-readable files using the model; and cleaning the data; and training the model, using supervised and unsupervised learning and the training data set, to build the well construction knowledge mining system.
Claims
exact text as granted — not AI-modifiedWhat is claimed is:
1 . A method of building a well construction knowledge mining system using an artificial intelligence ("AI") model and a plurality of databases, the method comprising:
accessing, within the plurality of databases, a set of well construction files;
wherein the set of well construction files comprise files in a plurality of formats; and
wherein the set of well construction files comprise data relating to well construction operations;
preprocessing the set of well construction files to generate a training data set, comprising:
reformatting at least a portion of the data to standardized machine-readable data;
labeling data in the machine-readable files using the model; and
cleaning the data;
and
training the model, using supervised and unsupervised learning and the training data set, thereby building the well construction knowledge mining system.
2 . The method of claim 1 , further comprising:
receiving well construction data associated with a rig activity; providing, as input to the trained model, the well construction data; predicting, by the trained model and based on the well construction data, a future rig activity; and generating, by the trained model, output that is directed to the future rig activity.
3 . The method of claim 2 , further comprising automatically controlling, by a controller of a rig and in response to the output, at least a portion of the rig based on the output.
4 . The method of claim 2 , wherein the output comprises an advisory relating to the future rig activity.
5 . The method of claim 4 , wherein the advisory comprises a recommended action.
6 . The method of claim 2 , wherein the data relating to well construction operations comprises:
data generated in response to a safety incident involving a personnel associated with a drilling rig; and data that identifies: the role of the personnel, the area where the incident occurred, and whether an external parameter is associated with the safety incident.
7 . The method of claim 2 ,
wherein the data relating to well construction operations comprises data generated in response a maintenance task associated with equipment;
wherein the future rig activity is associated with rig equipment; and
wherein the output that is directed to the future rig activity comprises a recommendation to perform maintenance on the rig equipment.
8 . The method of claim 2 , wherein the set of well construction files comprises:
data generated in response a maintenance task associated with equipment; and
data generated to record equipment failure and data associated with a recording system and run-time logs from a drilling rig.
9 . The method of claim 2 ,
wherein the rig activity comprises a drilling activity;
wherein the well construction data comprises downhole data;
wherein the downhole data comprises formation data generated during the drilling activities; and
wherein the output comprises:
a formation related prediction; and
target drilling instructions based on the formation related prediction.
10 . The method of claim 1 , wherein the model comprises a retrieval-augmented generation model.
11 . A system configured to build a well construction knowledge mining system using an artificial intelligence ("AI") model and a plurality of databases, the system comprising a non-transitory computer readable medium having stored thereon a plurality of instructions, wherein the instructions are executed with one or more processors so that the following steps are executed:
accessing, within the plurality of databases, a set of well construction files;
wherein the set of well construction files comprise files in a plurality of formats; and
wherein the set of well construction files comprise data relating to well construction operations;
preprocessing the set of well construction files to generate a training data set, comprising:
reformatting at least a portion of the data to standardized machine-readable data;
labeling data in the machine-readable files using the model; and
cleaning the data;
and
training the model, using supervised and unsupervised learning and the training data set, thereby building the well construction knowledge mining system.
12 . The system of claim 11 , wherein the instructions are executed with one or more processors so that the following steps are executed:
receiving well construction data associated with a rig activity; providing, as input to the trained model, the well construction data; predicting, by the trained model and based on the well construction data, a future rig activity; and generating, by the trained model, output that is directed to the future rig activity.
13 . The system of claim 12 , wherein the instructions are executed with one or more processors so that the following step is executed: automatically controlling, by a controller of a rig and in response to the output, at least a portion of the rig based on the output.
14 . The system of claim 12 , wherein the output comprises an advisory relating to the future rig activity.
15 . The system of claim 14 , wherein the advisory comprises a recommended action.
16 . The system of claim 12 , wherein the data relating to well construction operations comprises:
data generated in response to a safety incident involving a personnel associated with a drilling rig; and data that identifies: the role of the personnel, the area where the incident occurred, and whether an external parameter is associated with the safety incident.
17 . The system of claim 12 ,
wherein the data relating to well construction operations comprises data generated in response a maintenance task associated with equipment;
wherein the future rig activity is associated with rig equipment; and
wherein the output that is directed to the future rig activity comprises a recommendation to perform maintenance on the rig equipment.
18 . The system of claim 12 , wherein the set of well construction files comprises:
data generated in response a maintenance task associated with equipment; and
data generated to record equipment failure and data associated with a recording system and run-time logs from a drilling rig.
19 . The system of claim 12 ,
wherein the rig activity comprises a drilling activity;
wherein the well construction data comprises downhole data;
wherein the downhole data comprises formation data generated during the drilling activities; and
wherein the output comprises:
a formation related prediction; and
target drilling instructions based on the formation related prediction.
20 . The system of claim 11 , wherein the model comprises a retrieval-augmented generation model.Join the waitlist — get patent alerts
Track US2026071534A1 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.