US2025027739A1PendingUtilityA1

Cam synchronization device for archery bow

Assignee: BOWTECH LLCPriority: Sep 14, 2022Filed: Oct 3, 2024Published: Jan 23, 2025
Est. expirySep 14, 2042(~16.1 yrs left)· nominal 20-yr term from priority
F41B 5/10F41B 5/1403F41B 5/105
56
PatentIndex Score
0
Cited by
0
References
0
Claims

Abstract

A timing adjustment assembly for a compound archery bow is provided. The timing adjustment assembly is coupled with a pulley assembly and power cable of the archery bow. The timing adjustment assembly includes an adjustable component and a stationary component. The stationary component is attached to either the pulley assembly, the power cable, or the riser of the archery bow. The adjustable component is configured to move in a linear direction between multiple positional arrangements relative to the stationary component. The movement of the adjustable component changes the effective length of the power cable by moving the termination anchor point of the power cable or deflecting the power cable. The timing adjustment assembly adjusts the effective length of the power cable and relative synchronization of the pulley assembly with the archery bow in a brace position.

Claims

exact text as granted — not AI-modified
What is claimed is: 
     
         1 . A timing adjustment assembly for a compound archery bow comprising a riser and at least one power cable extending between two pulley assemblies, the timing adjustment assembly comprising:
 a stationary component attached to the riser of the compound archery bow; and   an adjustable component moveably connected to the stationary component and configured to selectively move relative to the stationary component between two or more different positional arrangements;   wherein the adjustable component is coupled to the at least one power cable;   wherein each positional arrangement of the two or more different positional arrangements of the adjustable component imparts a different effective length of the at least one power cable while the compound archery bow is in a brace position;   wherein selectively moving the adjustable component between two different positional arrangements changes the effective length of the at least one power cable when the compound archery bow is in the brace position.   
     
     
         2 . The timing adjustment assembly of  claim 1 , wherein the adjustable component includes an anchor post for anchoring a termination end of the at least one power cable to the adjustable component. 
     
     
         3 . The timing adjustment assembly of  claim 1 , wherein the adjustable component is configured to be continuously adjustable relative to the stationary component between the two or more different positional arrangements. 
     
     
         4 . The timing adjustment assembly of  claim 1 , wherein:
 the at least one power cable includes a first split end and a second split end;   a portion of the first split end is anchored to the adjustable component; and   a portion of the second split end is anchored to one of the two pulley assemblies of the compound archery bow.   
     
     
         5 . The timing adjustment assembly of  claim 4 , wherein an intermediate pulley component receives the at least one power cable and divides the at least one power cable into the first split end and the second split end. 
     
     
         6 . The timing adjustment assembly of  claim 1  further comprising a locking fastener selectively connecting the stationary component and the adjustable component, wherein when the locking fastener is in a fully engaged configuration, the adjustable component is secured in a fixed position relative to the stationary component. 
     
     
         7 . The timing adjustment assembly of  claim 1  further comprising an adjustment fastener, wherein movement of the adjustment fastener causes the adjustable component to move in a generally linear path relative to the stationary component between the two or more different positional arrangements. 
     
     
         8 . The timing adjustment assembly of  claim 1 , wherein:
 the stationary component comprises an at least partially hollow interior defined in the riser of the compound archery bow;   the adjustable component comprises a base portion received within the at least partially hollow interior and an anchor post extending from the base portion, wherein the base portion is selectively moveable within the at least partially hollow interior; and   at least a portion of the at least one power cable is anchored to the anchor post.   
     
     
         9 . The timing adjustment assembly of  claim 8 , wherein the anchor post extends from the base portion through an opening of the at least partially hollow interior. 
     
     
         10 . The timing adjustment assembly of  claim 1 , wherein:
 the stationary component comprises a mounting fastener fixedly attached to a riser of the compound bow;   the adjustable component comprises an adjustable block coupled to the mounting fastener and an anchor post extending from the adjustable block;   the adjustable block is selectively moveable along a length of the mounting fastener; and   the at least one power cable is anchored to the anchor post.   
     
     
         11 . An archery bow comprising:
 a riser;   first and second bow limbs secured to opposing ends of the riser;   first and second pulley assemblies;   a draw cable;   at least one power cable extending between the first and second pulley assemblies; and   a timing adjustment assembly comprising:
 a stationary component attached to the riser; and 
 an adjustable component moveably connected to the stationary component and configured to selectively move relative to the stationary component between two or more different positional arrangements; 
 wherein the adjustable component is coupled to the at least one power cable; 
 wherein each positional arrangement of the two or more different positional arrangements of the adjustable component imparts a different effective length of the at least one power cable while the compound archery bow is in a brace position; 
 wherein selectively moving the adjustable component between two different positional arrangements changes the effective length of the at least one power cable when the compound bow is in the brace position. 
   
     
     
         12 . The archery bow of  claim 11 , further comprising an intermediate pulley component, wherein:
 the intermediate pulley component receives the at least one power cable and divides the at least one power cable into a first split end and a second split end;   a portion of the first split end of the at least one power cable is anchored to the adjustable component; and   a portion of the second split end of the at least one power cable is anchored to one of the first and second pulley assemblies of the compound archery bow.   
     
     
         13 . The archery bow of  claim 11  further comprising:
 a locking fastener connecting the stationary component and the adjustable component, wherein when the locking fastener is in a fully engaged configuration, the adjustable component is secured in a fixed position relative to the stationary component; and 
 an adjustment fastener, wherein movement of the adjustment fastener causes the adjustable component to move relative to the stationary component between the two or more different positional arrangements. 
 
     
     
         14 . An archery bow comprising:
 a riser;   first and second bow limbs secured to opposing ends of the riser;   first and second pulley assemblies;   a draw cable; and   at least one power cable extending between the first and second pulley assemblies;   wherein a portion of the at least one power cable is coupled to the riser.   
     
     
         15 . The archery bow of  claim 14  further comprising an intermediate pulley component, wherein:
 the intermediate pulley component receives the at least one power cable and divides the at least one power cable into a first split end and a second split end; 
 the first split end of the at least one power cable is coupled to the riser; and 
 the second split end of the at least one power cable is coupled to one of the first and second pulley assemblies. 
 
     
     
         16 . The archery bow of  claim 14 , wherein:
 the riser comprises a stationary component and an adjustable component moveably connected to the stationary component;   the adjustable component is configured to selectively move relative to the stationary component between two or more different positional arrangements; and   the adjustable component is coupled to the portion of the least one power cable that is coupled to the riser.   
     
     
         17 . The archery bow of  claim 16 , wherein each positional arrangement of the two or more different positional arrangements of the adjustable component imparts a different effective length of the at least one power cable while the compound archery bow is in a brace position. 
     
     
         18 . The archery bow of  claim 16  further comprising:
 a locking fastener connecting the stationary component and the adjustable component, wherein when the locking fastener is in a fully engaged configuration, the adjustable component is secured in a fixed position relative to the stationary component; and 
 an adjustment fastener, wherein movement of the adjustment fastener causes the adjustable component to move relative to the stationary component between the two or more different positional arrangements. 
 
     
     
         19 . The archery bow of  claim 14  further comprising a timing adjustment assembly provided on the riser, wherein:
 the timing adjustment assembly comprises a mounting fastener fixedly mounted within a housing of the riser, an adjustable component coupled to the mounting fastener and selectively moveable along a length of the mounting fastener, and an adjustment fastener coupled to the adjustable component; 
 the adjustable component is coupled to the portion of the least one power cable that is coupled to the riser; and 
 movement of the adjustment fastener causes the adjustable component to move along the length of the mounting fastener between the two or more different positional arrangements and imparts a different effective length of the at least one power cable while the compound archery bow is in a brace position. 
 
     
     
         20 . The archery bow of  claim 14  further comprising a timing adjustment assembly provided on the riser, wherein:
 the timing adjustment assembly comprises a ratcheting system coupled to an adjustable component; 
 the ratcheting system is configured to selectively move the adjustable component relative to the riser between two or more different positional arrangements; 
 the adjustable component is coupled to the portion of the least one power cable that is coupled to the riser.

Join the waitlist — get patent alerts

Track US2025027739A1 — get alerts on status changes and closely related new filings.

We store only your email — no account needed. See our privacy policy.