US2024262235A1PendingUtilityA1
Management device and management system
Est. expiryFeb 8, 2043(~16.5 yrs left)· nominal 20-yr term from priority
H02J 2103/35B60L 58/10B60L 53/62B60L 53/00H02J 3/466H02J 3/322B60L 2260/50B60L 2240/70B60L 2240/80B60L 3/00B60L 55/00B60L 53/68B60L 53/67B60L 53/63
56
PatentIndex Score
0
Cited by
0
References
0
Claims
Abstract
When an abnormality that disables charging and discharging is detected, the processor estimates a predicted recovery time until recovery from the abnormality, in accordance with a type of the abnormality. The processor sets the charging and discharging vehicle equipped with the battery that was connected to the EVSE when the abnormality was detected as a vehicle to be used for the electric power supply-and-demand plan after the EVSE's predicted recovery time has elapsed.
Claims
exact text as granted — not AI-modifiedWhat is claimed is:
1 . A management device that manages an electric power supply-and-demand plan for a plurality of electric power regulation resources, each of which is electrically connectable to an electric power system via charging and discharging equipment, the management device comprising:
a processor; and memory that stores a program executable by the processor, wherein the processor estimates, when an abnormality that disables charging and discharging is detected, a predicted recovery time until recovery from the abnormality, in accordance with a type of the abnormality, and sets an object vehicle, in which is installed an electric power regulation resource that was connected to the charging and discharging equipment when the abnormality was detected, as a vehicle to be used for an electric power supply-and-demand plan after the predicted recovery time elapses at the charging and discharging equipment.
2 . The management device according to claim 1 , wherein the abnormality occurred in the object vehicle.
3 . The management device according to claim 2 , wherein the processor
selects, when the abnormality is detected, a vehicle to be connected to the charging and discharging equipment instead of the object vehicle, from among a candidate vehicle group used in the electric power supply-and-demand plan at the charging and discharging equipment, and adds the object vehicle to the candidate vehicle group.
4 . The management device according to claim 3 , wherein:
an order of connection to the charging and discharging equipment is set for each vehicle in the candidate vehicle group; and when adding the object vehicle to the candidate vehicle group, the processor determines the order of connecting the object vehicle to the charging and discharging equipment based on the predicted recovery time.
5 . A management system, comprising:
charging and discharging equipment; a plurality of electric power regulation resources, each of which is electrically connectable to an electric power system via the charging and discharging equipment; and a management device that manages an electric power supply-and-demand plan for the electric power regulation resources, wherein the management device estimates, when an abnormality that disables charging and discharging is detected, a predicted recovery time until recovery from the abnormality, in accordance with a type of the abnormality, and sets an object vehicle, in which is installed an electric power regulation resource that was connected to the charging and discharging equipment when the abnormality was detected, as a vehicle to be used for an electric power supply-and-demand plan after the predicted recovery time elapses at the charging and discharging equipment.Join the waitlist — get patent alerts
Track US2024262235A1 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.