US2024255157A1PendingUtilityA1

Heating system

Assignee: RINNAI KKPriority: Jan 31, 2023Filed: Jan 11, 2024Published: Aug 1, 2024
Est. expiryJan 31, 2043(~16.5 yrs left)· nominal 20-yr term from priority
Inventors:Shingo Kondo
F24D 19/1012F24D 3/00F24D 19/1015F24D 19/1039F24D 3/18
63
PatentIndex Score
0
Cited by
0
References
0
Claims

Abstract

The present invention provides a heating system capable of implementing an inrush current countermeasure without causing an increase in cost. A control means of the heating system repeatedly executes, in a predetermined cycle, a sequence starting operation of the fluid flowing part, the predetermined cycle being divided into a plurality of operation start permitted intervals, and the operation start permitted intervals permitting, among the fluid flowing part, only a specific fluid flowing part determined for each operation start permitted interval, to start operating, and prohibiting the other fluid flowing part other than the specific fluid flowing part from starting to operate.

Claims

exact text as granted — not AI-modified
What is claimed is: 
     
         1 . A heating system, comprising:
 a heat source having a heating unit configured to heat a fluid;   a heating terminal of which a plurality can be installed;   an inflow pipe connected to a fluid inlet of the heating unit;   an outflow pipe connected to a fluid outlet of the heating unit;   a branch supply pipe directly or indirectly connected to the outflow pipe and connected to a fluid inlet of the heating terminal;   a branch recovery pipe connected to a fluid outlet of the heating terminal and directly or indirectly connected to the inflow pipe;   a plurality of fluid flowing part configured to circulate the fluid by operating; and   control means configured to control operation of the plurality of fluid flowing part,   wherein the fluid flowing part is provided to the inflow pipe or the outflow pipe and is provided to the branch supply pipe or the branch recovery pipe,   the fluid flowing part provided to the inflow pipe or the outflow pipe is a pump,   the fluid flowing part provided to the branch supply pipe or the branch recovery pipe is a pump or an on-off valve,   the control means repeatedly executes, in a predetermined cycle, a sequence to start the operation of the fluid flowing part,   the predetermined cycle is divided into a plurality of operation start permitted intervals, and   each of the operation start permitted intervals has a control configuration in which, among the fluid flowing part, only a specific fluid flowing part determined for each operation start permitted interval is permitted to start operating, and the other fluid flowing part other than the specific fluid flowing part is prohibited from starting to operate.   
     
     
         2 . The heating system according to  claim 1 , wherein an operation start prohibited interval for prohibiting all the fluid flowing part from starting to operate is provided between each the operation start permitted intervals. 
     
     
         3 . The heating system according to  claim 2 , wherein a period of the operation start prohibited interval is set to be equal to or longer than a time required for a current value of the fluid flowing part to become a steady-state current after operation of the fluid flowing part is started. 
     
     
         4 . The heating system according to  claim 2 , wherein a period of the operation start permitted interval is set to be a shorter time than a period of the operation start prohibited interval. 
     
     
         5 . The heating system according to  claim 3 , wherein a period of the operation start permitted interval is set to be a shorter time than a period of the operation start prohibited interval.

Join the waitlist — get patent alerts

Track US2024255157A1 — get alerts on status changes and closely related new filings.

We store only your email — no account needed. See our privacy policy.