US2023407631A1PendingUtilityA1
Foam pod foundation system and method of assembly
Assignee: TRUE POD FOUND SYSTEMS LLCPriority: Jun 20, 2022Filed: Jun 20, 2022Published: Dec 21, 2023
Est. expiryJun 20, 2042(~15.9 yrs left)· nominal 20-yr term from priority
E04B 5/38E04B 5/43E02D 27/02E02D 2300/002
24
PatentIndex Score
0
Cited by
0
References
0
Claims
Abstract
A building foundation that includes a plurality of foam pods disposed on a graded surface and a concrete structure disposed around the plurality of foam pods.
Claims
exact text as granted — not AI-modifiedWhat is claimed is:
1 . A building foundation, comprising:
a plurality of foam pods disposed on a graded surface; and a concrete structure disposed around the plurality of foam pods.
2 . The building foundation of claim 1 wherein the plurality of foam pods comprise a plurality of identical foam pods.
3 . The building foundation of claim 1 wherein the plurality of foam pods comprise a polystyrene foam.
4 . The building foundation of claim 1 wherein the plurality of foam pods comprise quadrilateral foam pods.
5 . The building foundation of claim 1 wherein the plurality of foam pods are spaced evenly.
6 . The building foundation of claim 1 further comprising a plurality of spacers between the foam pods.
7 . The building foundation of claim 1 further comprising a plurality of circular spacers between the foam pods.
8 . The building foundation of claim 1 further comprising a plurality of post-tension cables disposed in the concrete structure.
9 . The building foundation of claim 1 further comprising a plurality of post-tension cables disposed in the concrete structure at a first level and a second plurality of post-tension cables disposed in the concrete structure at a second level.
10 . A method for constructing a building foundation, comprising:
generating a first user control using a data processing machine to initiate installation of a plurality of foam pods disposed on a graded surface; and generating a second user interface control after completion of the installation of the plurality of foam pods to initiate installation of a concrete structure disposed around the plurality of foam pods.
11 . The method of claim 10 wherein the first user control identifies a number of the plurality of foam pods.
12 . The method of claim 10 wherein the first user control identifies a number of the plurality of foam pods that remain to be installed.
13 . The method of claim 10 wherein the first user control identifies a number of the plurality of foam pods that have already been installed.
14 . The method of claim 10 wherein the first user control identifies when the graded surface has been completed.
15 . The method of claim 10 wherein the first user control identifies when installation of the plurality of foam pods has been completed.
16 . The method of claim 10 wherein the first user control identifies when installation of the plurality of foam pods has been interrupted.
17 . The method of claim 10 wherein the first user control identifies when installation of the concrete structure has been completed.
18 . The method of claim 10 wherein the first user control identifies when installation of the concrete structure has been interrupted.
19 . A method for forming a building foundation having a plurality of foam pods disposed on a graded surface, a concrete structure disposed around the plurality of foam pods, wherein the plurality of foam pods comprise a plurality of identical foam pods, wherein the plurality of foam pods comprise a polystyrene foam, wherein the plurality of foam pods comprise quadrilateral foam pods, wherein the plurality of foam pods are spaced evenly, a plurality of spacers between the foam pods, a plurality of circular spacers between the foam pods, a plurality of post-tension cables disposed in the concrete structure and a plurality of post-tension cables disposed in the concrete structure at a first level and a second plurality of post-tension cables disposed in the concrete structure at a second level, the method comprising:
generating a first user control using a data processing machine to initiate installation of a plurality of foam pods disposed on a graded surface; generating a second user interface control after completion of the installation of the plurality of foam pods to initiate installation of a concrete structure disposed around the plurality of foam pods; wherein the first user control identifies a number of the plurality of foam pods; wherein the first user control identifies a number of the plurality of foam pods that remain to be installed; wherein the first user control identifies a number of the plurality of foam pods that have already been installed; wherein the first user control identifies when the graded surface has been completed; wherein the first user control identifies when installation of the plurality of foam pods has been completed; wherein the first user control identifies when installation of the plurality of foam pods has been interrupted; wherein the first user control identifies when installation of the concrete structure has been completed; and wherein the first user control identifies when installation of the concrete structure has been interrupted.Join the waitlist — get patent alerts
Track US2023407631A1 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.