US2023287676A1PendingUtilityA1

Temporary facility constructing method and hospital ship

Assignee: KAWASAKI HEAVY IND LTDPriority: Jul 29, 2020Filed: May 11, 2021Published: Sep 14, 2023
Est. expiryJul 29, 2040(~14 yrs left)· nominal 20-yr term from priority
B63J 1/00B63J 99/00E04H 1/02E04H 3/08E04B 1/34861B63B 25/00B63B 35/00
43
PatentIndex Score
0
Cited by
0
References
0
Claims

Abstract

A temporary facility constructing method includes: mooring a hospital ship, loaded with containers, within a range of a predetermined distance from a temporary facility planned construction site; unloading the containers from the hospital ship and carrying the containers to the temporary facility planned construction site; assembling the containers at the temporary facility planned construction site to construct at least one of a residential facility or a medical facility; arranging an electric power cable connecting the hospital ship and at least one of the residential facility or the medical facility; and supplying electricity, generated by the hospital ship, through the electric power cable to at least one of the residential facility or the medical facility.

Claims

exact text as granted — not AI-modified
1 . A temporary facility constructing method comprising:
 mooring a hospital ship, loaded with containers, within a range of a predetermined distance from a temporary facility planned construction site;   unloading the containers from the hospital ship and carrying the containers to the temporary facility planned construction site;   assembling the containers at the temporary facility planned construction site to construct at least one of a residential facility or a medical facility;   arranging an electric power cable connecting the hospital ship and at least one of the residential facility or the medical facility; and   supplying electricity, generated by the hospital ship, through the electric power cable to at least one of the residential facility or the medical facility.   
     
     
         2 . A temporary facility constructing method comprising:
 mooring a hospital ship, loaded with containers, within a range of a predetermined distance from a temporary facility planned construction site;   unloading the containers from the hospital ship and carrying the containers to the temporary facility planned construction site;   assembling the containers at the temporary facility planned construction site to construct at least one of a residential facility or a medical facility; and   supplying water, produced by the hospital ship, to at least one of the residential facility or the medical facility.   
     
     
         3 . A temporary facility constructing method comprising:
 mooring a hospital ship, loaded with containers, within a range of a predetermined distance from a temporary facility planned construction site;   unloading the containers from the hospital ship and carrying the containers to the temporary facility planned construction site;   assembling the containers at the temporary facility planned construction site to construct a medical facility; and   supplying oxygen, produced by the hospital ship, to the medical facility.   
     
     
         4 . A hospital ship including a hospital function,
 the hospital ship comprising:   a container loading structure loaded with containers which are assembled on ground to construct at least one of a residential facility or a medical facility; and   an electric power generation facility that generates electricity supplied to at least one of the residential facility or the medical facility, the residential facility or the medical facility being constructed by assembling the containers.   
     
     
         5 . A hospital ship including a hospital function,
 the hospital ship comprising:   a container loading structure loaded with containers which are assembled on ground to construct at least one of a residential facility or a medical facility; and   a water generation facility that produces water supplied to at least one of the residential facility or the medical facility, the residential facility or the medical facility being constructed by assembling the containers.   
     
     
         6 . A hospital ship including a hospital function,
 the hospital ship comprising:   a container loading structure loaded with containers which are assembled on ground to construct a medical facility; and   an oxygen producer that produces oxygen supplied to the medical facility, the medical facility being constructed by assembling the containers.

Join the waitlist — get patent alerts

Track US2023287676A1 — get alerts on status changes and closely related new filings.

We store only your email — no account needed. See our privacy policy.