US2023276488A1PendingUtilityA1
User equipment and method for scheduling timeline for cancelling uplink transmission
Est. expiryJul 22, 2040(~14 yrs left)· nominal 20-yr term from priority
Inventors:Hai-Han Wang
H04W 72/569H04W 72/1268H04W 72/23
72
PatentIndex Score
0
Cited by
0
References
0
Claims
Abstract
A user equipment and a method for scheduling a timeline for cancelling uplink (UL) transmission are provided. The method includes: transmitting a low priority UL channel; receiving a first DCI format scheduling a high priority UL channel; and cancelling the transmission of the low priority UL channel and transmitting the high priority UL channel in response to determining that the high priority UL channel overlaps in time with the low priority UL channel.
Claims
exact text as granted — not AI-modifiedWhat is claimed is:
1 . A method performed by a user equipment (UE) for scheduling a timeline for cancelling uplink (UL) transmission, the method comprising:
transmitting a low priority UL channel; receiving a first downlink control information (DCI) format scheduling a high priority UL channel; and cancelling the transmission of the low priority UL channel and transmitting the high priority UL channel in response to determining that the high priority UL channel overlaps in time with the low priority UL channel.
2 . The method of claim 1 , wherein a starting time of the high priority UL channel and an ending time of the first DCI format are separated by an offset greater than at least one absolute time duration.
3 . The method of claim 2 , wherein:
the at least one absolute time duration includes a first absolute time duration and a second absolute time duration, and the first absolute time duration is determined based on a radio resource control (RRC) configuration and the second absolute time duration is determined based on UE capability information.
4 . The method of claim 3 , wherein:
the low priority UL channel is scheduled by a second DCI format, and the UE capability information includes a number of symbols, and the second absolute time duration is a length of the number of symbols with a smallest subcarrier spacing (SCS) among an SCS of the first DCI format, an SCS of the second DCI format, an SCS of the low priority UL channel, and an SCS of the high priority UL channel.
5 . The method of claim 3 , wherein:
the high priority UL channel is a physical uplink shared channel (PUSCH), the first absolute time duration is determined based on a first type of a processing time of the PUSCH if the RRC configuration includes a configuration of the first type of the processing time of the PUSCH for a first serving cell of the high priority UL channel, and a configuration of the first type of the processing time of a physical downlink shared channel (PDSCH) for a second serving cell of the low priority UL channel, the first type of the processing time of the PUSCH is UE processing capability 2 of the PUSCH, and the first type of the processing time of the PDSCH is UE processing capability 2 of the PDSCH.
6 . The method of claim 3 , wherein:
the high priority UL channel is a physical uplink control channel (PUCCH), the first absolute time duration is determined based on a first type of a processing time of a physical uplink shared channel (PUSCH) if the RRC configuration includes a configuration of a first type of the processing time of a physical downlink shared channel (PDSCH) for a first serving cell of the high priority UL channel, and a configuration of the first type of the processing time of the PDSCH for a second serving cell of the low priority UL channel or the first type of the processing time of the PUSCH for a third serving cell of the low priority UL channel, the first type of the processing time of the PUSCH is UE processing capability 2 of the PUSCH, and the first type of the processing time of the PDSCH is UE processing capability 2 of the PDSCH.
7 . A user equipment (UE) for scheduling a timeline for cancelling uplink (UL) transmission, the UE comprising:
one or more non-transitory computer-readable media storing one or more computer-executable instructions; and at least one processor coupled to the one or more non-transitory computer-readable media, the at least one processor configured to execute the one or more computer-executable instructions to:
transmit a low priority UL channel;
receive a first downlink control information (DCI) format scheduling a high priority UL channel; and
cancel the transmission of the low priority UL channel and transmit the high priority UL channel in response to determining that the high priority UL channel overlaps in time with the low priority UL channel.
8 . The UE of claim 7 , wherein a starting time of the high priority UL channel and an ending time of the first DCI format are separated by an offset greater than at least one absolute time duration.
9 . The UE of claim 8 , wherein:
the at least one absolute time duration includes a first absolute time duration and a second absolute time duration, and the first absolute time duration is determined based on a radio resource control (RRC) configuration and the second absolute time duration is determined based on UE capability information.
10 . The UE of claim 9 , wherein:
the low priority UL channel is scheduled by a second DCI format, and the UE capability information includes a number of symbols, and the second absolute time duration is a length of the number of symbols with a smallest subcarrier spacing (SCS) among an SCS of the first DCI format, an SCS of the second DCI format, an SCS of the low priority UL channel, and an SCS of the high priority UL channel.
11 . The UE of claim 9 , wherein:
the high priority UL channel is a physical uplink shared channel (PUSCH), the first absolute time duration is determined based on a first type of a processing time of the PUSCH if the RRC configuration includes a configuration of the first type of the processing time of the PUSCH for a first serving cell of the high priority UL channel, and a configuration of the first type of the processing time of a physical downlink shared channel (PDSCH) for a second serving cell of the low priority UL channel, the first type of the processing time of the PUSCH is UE processing capability 2 of the PUSCH, and the first type of the processing time of the PDSCH is UE processing capability 2 of the PDSCH.
12 . The UE of claim 9 , wherein:
the high priority UL channel is a physical uplink control channel (PUCCH), the first absolute time duration is determined based on a first type of a processing time of a physical uplink shared channel (PUSCH) if the RRC configuration includes a configuration of a first type of the processing time of a physical downlink shared channel (PDSCH) for a first serving cell of the high priority UL channel, and a configuration of the first type of the processing time of the PDSCH for a second serving cell of the low priority UL channel or the first type of the processing time of the PUSCH for a third serving cell of the low priority UL channel, the first type of the processing time of the PUSCH is UE processing capability 2 of the PUSCH, and the first type of the processing time of the PDSCH is UE processing capability 2 of the PDSCH.
13 . A method performed by a base station for scheduling a timeline for cancelling uplink (UL) transmission, the method comprising:
receiving a low priority UL channel; transmitting a first downlink control information (DCI) format scheduling a high priority UL channel; and receiving the high priority UL channel after transmission of the low priority UL channel is canceled and the high priority UL channel is transmitted in response to determining that the high priority UL channel overlaps in time with the low priority UL channel.
14 . The method of claim 13 , wherein a starting time of the high priority UL channel and an ending time of the first DCI format are separated by an offset greater than at least one absolute time duration.
15 . The method of claim 14 , wherein:
the at least one absolute time duration includes a first absolute time duration and a second absolute time duration, and the first absolute time duration is determined based on a radio resource control (RRC) configuration and the second absolute time duration is determined based on UE capability information.
16 . The method of claim 15 , wherein:
the low priority UL channel is scheduled by a second DCI format, and the UE capability information includes a number of symbols, and the second absolute time duration is a length of the number of symbols with a smallest subcarrier spacing (SCS) among an SCS of the first DCI format, an SCS of the second DCI format, an SCS of the low priority UL channel, and an SCS of the high priority UL channel.
17 . The method of claim 15 , wherein:
the high priority UL channel is a physical uplink shared channel (PUSCH), the first absolute time duration is determined based on a first type of a processing time of the PUSCH if the RRC configuration includes a configuration of the first type of the processing time of the PUSCH for a first serving cell of the high priority UL channel, and a configuration of the first type of the processing time of a physical downlink shared channel (PDSCH) for a second serving cell of the low priority UL channel, the first type of the processing time of the PUSCH is UE processing capability 2 of the PUSCH, the first type of the processing time of the PDSCH is UE processing capability 2 of the PDSCH.
18 . The method of claim 15 , wherein:
the high priority UL channel is a physical uplink control channel (PUCCH), the first absolute time duration is determined based on a first type of a processing time of a physical uplink shared channel (PUSCH) if the RRC configuration includes a configuration of a first type of the processing time of a physical downlink shared channel (PDSCH) for a first serving cell of the high priority UL channel, and a configuration of the first type of the processing time of the PDSCH for a second serving cell of the low priority UL channel or the first type of the processing time of the PUSCH for a third serving cell of the low priority UL channel, the first type of the processing time of the PUSCH is UE processing capability 2 of the PUSCH, and the first type of the processing time of the PDSCH is UE processing capability 2 of the PDSCH.Join the waitlist — get patent alerts
Track US2023276488A1 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.