US2022389677A1PendingUtilityA1
System and method for multi-step waterproofing with moisture control
Est. expiryJun 4, 2041(~14.8 yrs left)· nominal 20-yr term from priority
F24F 11/0001E02D 31/02E04B 1/7069E04B 1/7023
39
PatentIndex Score
0
Cited by
0
References
0
Claims
Abstract
A system is provided that improves basement sustainability in regards to a building's sub-ground level foundation hydrostatic pressure modulation, waterproofing and interior air control and that yields sustained clean and dry interior space.
Claims
exact text as granted — not AI-modifiedWhat is claimed is:
1 . A method of controlling hydrostatic pressure, minimizing water intrusion and controlling interior air quality, comprising
installing a ventilation system; installing a pressure relief and back-up system; installing a foundation/footer joint line hydrostatic pressure relief system; and implementing exterior preparation.
2 . The method of claim 1 wherein installing the ventilation system comprises:
gathering inputs; and
installing (lowest possible), wherein installing is based at least in part on the gathered inputs.
3 . The method of claim 1 , wherein installing the pressure relief and back-up system comprises:
gathering inputs; removing designated amount of foundation slab; perforating selected items; final setting liner seating and connecting a pressure relief sump pump; installing the pressure relief and back-up system; and replace/refill base; wherein removing, perforating, final setting, searing and connecting, and installing are based at least in part on the gathered inputs.
4 . The method of claim 1 , wherein installing the foundation/footer joint line hydrostatic pressure relief system comprises:
gathering inputs; installing a plurality of pressure relief extensions; and installing foundation/footer joint line hydrostatic pressure relief; wherein the installing of the plurality of pressure relief extensions and foundation/footer joint line hydrostatic pressure relief is based at least in part on the gathered inputs.
5 . The method of claim 4 , wherein the installing the plurality of pressure relief extensions comprises:
removing foundation material to form trench; placing layer of fill in trench; installing and connecting drain pipe to drain tile; drilling holes; and cleaning and filling; wherein the removing, placing, installing and connecting, drilling, and cleaning and filling is based at least in part on the gathered inputs.
6 . The method of claim 1 , wherein the implementing exterior preparation comprises:
gathering inputs; inspecting exterior; correcting defects; and installing a Modern Drainage System (MDS); wherein the inspecting, correcting defects and installing MDS is based at least in part on the gathered inputs.
7 . The method of claim 6 , wherein the installing the MDS comprises:
gathering inputs; removing and coating; sealing; filling; placing and connecting drain pipe to drain tile; second filing; covering; creating J channel; and grade finishing; wherein the installing MDS is based at least in part on the gathered inputs.
8 . A system of controlling hydrostatic pressure, minimizing water intrusion and controlling interior air quality, comprising
a ventilation system; a pressure relief and back-up system; a foundation/footer joint line hydrostatic pressure relief system; and an exterior preparation.
9 . The system of claim 8 wherein the system further comprises:
a proprietary data store and a public data store; and
further wherein an installation of the ventilation system, the pressure relief and back-up system, the foundation/footer joint line hydrostatic pressure relief system and an implementation of the exterior preparation are based at least in part on legal and limit restriction rules in the public data store and input design parameters, wherein the input design parameters are in the proprietary date store, the public data store, or both the proprietary data store and the public data store.
10 . The system of claim 9 , wherein the installation of the ventilation system comprises installing at a lowest point, based at least in part on the legal and limit restriction rules and input design parameters.
11 . The system of claim 9 , wherein the installation of the pressure relief and back-up system comprises:
removing designated amount of foundation slab; perforating selected items; final setting liner seating and connecting a pressure relief sump pump; installing power back-up system; and replacing/refilling base; wherein removing, perforating, final setting, seating and connecting, and installing are based at least in part on the legal and limit restriction rules and input design parameters.
12 . The system of claim 9 , wherein the installation of the foundation/footer joint line hydrostatic pressure relief system comprises:
installing a plurality of pressure relief extensions; and installing foundation/footer joint line hydrostatic pressure relief; wherein the installing of the plurality of pressure relief extensions and foundation/footer joint line hydrostatic pressure relief is based at least in part on the legal and limit restriction rules and input design parameters.
13 . The system of claim 12 , wherein the installation of the plurality of pressure relief extensions comprises:
removing foundation material to form trench; placing layer of fill in trench; installing and connecting drain pipe to drain tile; drilling holes; and cleaning and filling; wherein the removing, placing, installing and connecting, drilling, and cleaning and filling is based at least in part on the legal and limit restriction rules and input design parameters.
14 . The system of claim 9 , wherein the implementation of the exterior preparation comprises:
inspecting exterior; correcting defects; and installing Modern Drainage System (MDS); wherein the inspecting, correcting defects and installing MDS is based at least in part on the legal and limit restriction rules and input design parameters.
15 . The system of claim 14 , wherein the installation of the MDS comprises:
removing and coating; sealing; filling; placing and connecting drain pipe to drain tile; second filing; covering; creating J channel; finishing grade; wherein the inspecting, correcting defects and installing [MDS] is based at least in part on the legal and limit restriction rules and input design parameters.Join the waitlist — get patent alerts
Track US2022389677A1 — get alerts on status changes and closely related new filings.