Fabrication, distribution, and integrated order processing system
Abstract
An order workflow system integrated with a fabrication/distribution system for managing workflow order. The system can receive a selection of a job number and a work order number and generate selectable line items based on the work order number. Selected line items associated with the work order type can be processed and an order workflow can be generated at an order queue process. The selected line items can be interfaced with a BIM database to identify the selected line items, at a spooling sub-queue process, and generate a control number for each line item. The line items can then be interfaced with an ERP module. Inventory data items can be generated from the selected line items and the inventory data items interfaced with an inventory API of the ERP module. The order workflow can be further processed in a similar queued and integrated manner with a fabrication/distribution system.
Claims
exact text as granted — not AI-modified1 - 20 . (canceled)
21 . A system comprising:
a storage resource; and a processor communicatively coupled to the storage resource, wherein the processor is configured to execute application code instructions stored in the storage resource to cause the system to:
receive predetermined order workflow system database fields;
receive predetermined building information management (BIM) database fields;
receive predetermined enterprise resource planning (ERP) database fields; and
standardize the predetermined order workflow system database (OWSD) fields, the predetermined building information management database (BIMD) fields and the predetermined enterprise resource planning database (ERPD) fields using data structures from one or more standards.
22 . The system of claim 21 wherein the standards comprise one or more of a Mechanical Contractors Association of America/Sheet Metal standard, an Air Conditioning Contractors' National Association standard and a National Electrical Contractors Association standard.
23 . The system of claim 21 wherein the OWSD fields, the BIMD fields and the ERPD fields are standardized using an approval sub-queue process.
24 . The system of claim 21 further comprising receiving a selection of a job number, work order number, and a delivery date at an order workflow system using the standardized fields from the OWSD fields, the BIMD fields and the ERPD fields.
25 . The system of claim 21 further comprising generating selectable line items for a BIM interface module based on the work order number and the standardized fields from the OWSD fields, the BIMD fields and the ERPD fields.
26 . The system of claim 21 further comprising processing selected line items associated with the work order type using the standardized fields from the OWSD fields, the BIMD fields and the ERPD fields.
27 . The system of claim 26 further comprising generating in response to the processed selected line items an order workflow, at an order queue process using the standardized fields from the OWSD fields, the BIMD fields and the ERPD fields.
28 . The system of claim 21 further comprising interfacing with a BIM database to identify the selected line items, at a spooling sub-queue process to determine if the order is approved for release or requires approval.
29 . The system of claim 28 further comprising submitting the selected line items that require approval to an associated approval queue for drawing creation.
30 . The system of claim 29 further comprising generating, in response, a control number for each line item.
31 . The system of claim 29 further comprising interfacing information associated with selected line items with an ERP module.
32 . A method comprising:
receiving predetermined order workflow system database fields at a processor that is communicatively coupled to a storage resource, wherein the processor is configured to execute application code instructions stored in the storage resource; receiving predetermined building information management (BIM) database fields at the processor; receiving predetermined enterprise resource planning (ERP) database fields at the processor; and standardizing the predetermined order workflow system database (OWSD) fields, the predetermined building information management database (BIMD) fields and the predetermined enterprise resource planning database (ERPD) fields using one or more standards and the processor.
33 . The method of claim 32 wherein the standards comprise one or more of a Mechanical Contractors Association of America/Sheet Metal standard, an Air Conditioning Contractors' National Association standard and a National Electrical Contractors Association standard.
34 . The method of claim 32 wherein the OWSD fields, the BIMD fields and the ERPD fields are standardized using an approval sub-queue process.
35 . The method of claim 32 further comprising receiving a selection of a job number, work order number, and a delivery date at an order workflow system using the standardized fields from the OWSD fields, the BIMD fields and the ERPD fields.
36 . The method of claim 32 further comprising generating selectable line items for a BIM interface module based on the work order number and the standardized fields from the OWSD fields, the BIMD fields and the ERPD fields.
37 . The method of claim 32 further comprising processing selected line items associated with the work order type using the standardized fields from the OWSD fields, the BIMD fields and the ERPD fields.
38 . The method of claim 37 further comprising generating in response to the processed selected line items an order workflow, at an order queue process using the standardized fields from the OWSD fields, the BIMD fields and the ERPD fields.
39 . The method of claim 32 further comprising interfacing with a BIM database to identify the selected line items, at a spooling sub-queue process to determine if the order is approved for release or requires approval.
40 . The method of claim 39 further comprising submitting the selected line items that require approval to an associated approval queue for drawing creation.Join the waitlist — get patent alerts
Track US2022101263A1 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.