Method for constructing structure
Est. expiryJan 7, 2039(~12.4 yrs left)· nominal 20-yr term from priority
E02D 29/055E02D 17/08E02D 2200/1628
17
PatentIndex Score
0
Cited by
0
References
0
Claims
Abstract
The present invention relates to a method for constructing a structure, the method comprising constructing an underground structure on the ground, and then constructing the structure in the ground by sinking same into the ground.
Claims
exact text as granted — not AI-modified1 . A structure construction method for constructing an underground structure on a ground and sinking the same into the ground, the method comprising steps of:
A) constructing a foundation plate ( 10 ) and a pile ( 20 ); B) installing a jack-down device and constructing a basement structure; C) performing excavation under the foundation plate ( 10 ) and sinking the underground structure; and D) dismantling the jack-down device and fixing the pile ( 20 ), wherein the jack-down device is installed on the foundation plate ( 10 ), such that a degree of sinking of the underground structure is controlled by adjusting force of the jack-down device, wherein the excavation under the foundation plate ( 10 ) and the sinking of the underground structure are performed in parallel.
2 . A structure construction method for constructing an underground structure on a ground and sinking the same into the ground, the method comprising steps of:
a) constructing an outer foundation plate ( 50 ) and a pile ( 20 ); b) installing a jack-down device; c) performing excavation under the outer foundation plate ( 50 ) and sinking the underground structure; and d) dismantling the jack-down device and fixing the pile ( 20 ), wherein the jack-down device is installed on the outer foundation plate ( 50 ), such that a degree of sinking of the underground structure is controlled by adjusting force of the jack-down device, wherein the excavation under the outer foundation plate ( 50 ) and the sinking of the underground structure are performed in parallel.
3 . The method of claim 1 or 2 , wherein the sinking is performed by a weight of the underground structure.
4 . The method of claim 1 or 2 , wherein the sinking is performed by a weight of the underground structure and additional external force.
5 . The method for claim 4 , wherein the additional external force is generated by:
increasing the load by adding a temporary load to the underground structure; using a rock anchor or earth anchor installed in the ground; or using main surface friction of the pile installed in the ground.
6 . The method of claim 1 or 2 , wherein the excavation is performed by:
using excavation equipment;
using a water jet; or
suctioning and discharging soil from the ground.
7 . The method of claim 1 , further comprising:
constructing an additional foundation plate on the foundation plate ( 10 ) and the pile ( 20 ) after the step D).
8 . The method of claim 2 , further comprising:
constructing an additional foundation plate on the outer foundation plate ( 50 ) and the pile ( 20 ) after the step d).Join the waitlist — get patent alerts