US2021318025A1PendingUtilityA1
Integrated boiler system
Est. expiryOct 18, 2038(~12.2 yrs left)· nominal 20-yr term from priority
Inventors:Hertzel Yaich
F24H 1/16F24H 1/121F24D 17/0031F24H 1/181F24H 1/00F24H 9/1818F24H 2250/02F24B 9/00F24H 9/0015F24H 1/185F24D 19/10
30
PatentIndex Score
0
Cited by
0
References
0
Claims
Abstract
The present invention is directed to an integrated boiler system, comprising: two separate boilers, one disposed inside the other, each of the boilers having: (a) a vertical partition disposed therein; (b) a water passage at a top side of the partition; and (c) a water passage at a bottom side of the partition; a chamber disposed in, or generated by, a gap between the boilers; and a heating element, disposed in the chamber, for heating the boilers simultaneously by the same energy.
Claims
exact text as granted — not AI-modified1 . An integrated boiler system, comprising:
two separate boilers, one disposed inside other, each of said boilers having:
(a) a vertical partition disposed therein;
(b) a water passage at a top side of said partition; and
(c) a water passage at a bottom side of said partition;
a chamber disposed in, or generated by, a gap between said boilers; and a heating element, disposed in said chamber, for heating said boilers simultaneously by same energy
2 . The system according to claim 1 , wherein at least one of said water passages is adjustable.
3 . The system according to claim 1 , wherein said partition is telescopic.
4 . The system according to claim 1 , wherein said heating element is a filament.
5 . The system according to claim 1 , wherein said heating element is a coil.
6 . The system according to claim 1 , wherein each of said boilers has a cylindrical form.
7 . The system according to claim 1 , wherein a ratio of volumes created by said partition is adjustable.Join the waitlist — get patent alerts
Track US2021318025A1 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.