US2021214943A1PendingUtilityA1
Column anchoring system for wind uplift resistance
Assignee: HB&G BUILDING PRODUCTS INCPriority: Jan 15, 2020Filed: Jan 15, 2021Published: Jul 15, 2021
Est. expiryJan 15, 2040(~13.5 yrs left)· nominal 20-yr term from priority
E04C 5/125E04B 1/215E04C 5/12E04B 1/4135E04H 9/14
42
PatentIndex Score
0
Cited by
0
References
0
Claims
Abstract
An inter-column anchor engages a top surface of header above a corresponding column, and the foundation below the corresponding column. The header anchor and/or the foundation anchor are adjustable to increase or decrease tension. The header anchor and foundation anchor are joined by a cable that may be grossly adjustable in length to accommodate various column heights. The elements of the inter-column anchor may be organized into a kit for distribution.
Claims
exact text as granted — not AI-modifiedWhat is claimed is:
1 . An inter-column anchor comprising:
a header anchor comprising:
a flange configured to abut an upper surface of a header; and
a tension adjustment element;
a foundation anchor configured to engage a hole in a foundation; and a tension wire configured to engage the header anchor and the foundation anchor, wherein the inter-column anchor is configured to apply a downward force to the header above a column to resist a lift to a roof overhang from an updraft.
2 . The inter-column anchor of claim 1 , wherein the foundation anchor comprises an expanding concrete anchor.
3 . The inter-column anchor of claim 1 , wherein the foundation anchor comprises:
an internally threaded sleeve; and a bolt configured to engage the internally threaded sleeve.
4 . The inter-column anchor of claim 1 , further comprising a tension wire length adjuster.
5 . The inter-column anchor of claim 1 , wherein the foundation anchor comprises a tension adjustment element.
6 . The inter-column anchor of claim 1 , wherein the header anchor is affixed to the tension wire via a stud-end sleeve grip.
7 . The inter-column anchor of claim 6 , wherein the foundation anchor is affixed to the tension wire via a stud-end sleeve grip.
8 . The inter-column anchor of claim 6 , wherein the foundation anchor is affixed to the tension wire via an eye loop.
9 . A kit comprising:
a header anchor; a foundation anchor configured to engage a hole in a foundation; and a tension wire configured to engage the header anchor and the foundation anchor. wherein the kit is configured to be installed with the tension wire disposed inside a column disposed between a header and the foundation, to apply a compressive force to the column.
10 . The kit of claim 9 , wherein the foundation anchor comprises an expanding concrete anchor.
11 . The kit of claim 9 , wherein the foundation anchor comprises:
an internally threaded sleeve; and a bolt configured to engage the internally threaded sleeve.
12 . The kit of claim 11 , further comprising a second foundation anchor comprising an expanding concrete anchor.
13 . The kit of claim 9 , further comprising a tension wire length adjuster.
14 . The kit of claim 9 , wherein the foundation anchor comprises a tension adjustment element.
15 . The kit of claim 9 , further comprising a concrete adhesive for securing the foundation anchor into a foundation.
16 . A method for preventing uplift of an overhang proximal to a column, the method comprising:
drilling a foundation hole in a foundation; inserting a foundation anchor into the foundation hole; securing the foundation anchor in the foundation hole; inserting a tension wire, affixed to the foundation anchor at a proximal end, through a hollow column; inserting a header anchor, affixed to the tension wire at a distal end, through a header; placing the hollow column between the foundation and the header at a location corresponding to the foundation anchor and the header anchor; and applying tension to the tension wire.
17 . The method of claim 16 , further comprising adjusting the length of the tension wire prior to applying tension.
18 . The method of claim 16 , wherein securing the foundation anchor comprises gluing the foundation anchor in the foundation hole with a concrete adhesive.
19 . The method of claim 16 , wherein applying tension comprises adjusting a tension element of the header anchor.
20 . The method of claim 19 , wherein applying tension further comprises adjusting a tension element of the foundation anchor.Join the waitlist — get patent alerts
Track US2021214943A1 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.