US2021002983A1PendingUtilityA1
Chemically treated substrate strips in screens for open hole gravel packing and stand alone screens
Est. expiryJul 2, 2039(~12.9 yrs left)· nominal 20-yr term from priority
E21B 43/088E21B 37/06
38
PatentIndex Score
0
Cited by
0
References
0
Claims
Abstract
A production string and method of preventing accumulation of a compositional material in a production string. An inhibitor strip is disposed in a fluid inflow device of the production string. Fluid is received at the inhibitor strip in the fluid inflow device from a formation. The inhibitor strip includes a chemical inhibitor that interacts with a chemical in the fluid to reduce the production of the compositional material in the production string.
Claims
exact text as granted — not AI-modifiedWhat is claimed is:
1 . A method of preventing production of a compositional material in a production string, comprising:
disposing an inhibitor strip in a fluid inflow device of the production string, the inhibitor strip having a coating of a chemical inhibitor on a surface of the inhibitor strip; and receiving a fluid at the fluid inflow device from a formation to flow across the inhibitor strip, wherein lithe chemical inhibitor interacts with a chemical in the fluid to reduce the production of the compositional material in the production string.
2 . The method of claim 1 , wherein the fluid inflow device includes a base pipe and a screen forming an annular region around the base pipe, further comprising disposing the inhibitor strip in a channel between the base pipe and the screen.
3 . The method of claim 2 , wherein the screen and the base pipe form one or more drainage channels, further comprising disposing the inhibitor strip in the one or more drainage channels.
4 . The method of claim 2 , wherein the inhibitor strip is elongated along a longitudinal axis of the base pipe.
5 . The method of claim 2 , wherein disposing the inhibitor strip further comprising placing a plurality of inhibitor strips circumferentially around an axial section of the base pipe.
6 . The method of claim 1 , wherein the inhibitor strip is further impregnated with the chemical inhibitor.
7 . The method of claim 1 , further comprising recharging the inhibitor strip with the chemical inhibitor at its location in the wellbore.
8 . The method of claim 1 , wherein the compositional material includes at least one of scale, paraffin and asphaltene.
9 . A production string, comprising:
a fluid inflow device; and an inhibitor strip disposed in contact with the fluid inflow device, the inhibitor strip having a coating of a chemical inhibitor on a surface of the inhibitor strip that interacts with chemicals in a fluid flowing through the fluid inflow device and across the inhibitor strip to reduce the production of a compositional material in the production string.
10 . The production string of claim 9 , further comprising:
a base pipe of the fluid inflow device; and a screen forming an annular region around the base pipe; wherein the inhibitor strip is disposed within the annular region.
11 . The production string of claim 10 , further comprising one or more drainage channels between the base pipe and the screen, wherein the inhibitor strip is disposed within the one or more drainage channels.
12 . The production string of claim 10 , wherein the inhibitor strip is elongated along a longitudinal axis of the base pipe.
13 . The production string of claim 10 , wherein the inhibitor strip further comprises a plurality of inhibitor strips disposed circumferentially around an axial section of the base pipe.
14 . The production string of claim 9 , wherein the inhibitor strip is further impregnated with the chemical inhibitor.
15 . The production string of claim 9 , wherein the inhibitor strip is capable of being recharged with additional chemical inhibitor when deployed in a wellbore.Join the waitlist — get patent alerts
Track US2021002983A1 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.