Pipeline exterior blasting system
Abstract
A pipeline exterior blasting system, movably mounted to a pipeline, to blast only uncoated end sections of a first and second pipe at a weld site where the first and second pipes were welded together. Uniquely, there is a blasting containment device having: a fixed portion 22; a rotating containment portion 24 rotatably mounted to the fixed portion 22, and releasably and rotatively coupled to the second pipe 20B; a support devices system 106, coupled to the blasting containment device 12 via connections 107, including: a blasting device 16, a vacuum device 18; and an electrical power generator 14. Finally, there is a lateral movement system, coupled to the blasting containment device 12, having: a first position that holds the grit blasting containment device 12 in a fixed position as the grit blasting containment device blasts particles circumferentially around the two pipes; a second position that moving the grit blasting containment device off of the two pipes; and a third position that provides movement of the grit blasting containment device along the two pipes.
Claims
exact text as granted — not AI-modified1 . A pipeline exterior blasting system 10 , movably mounted to a pipeline 20 , to blast only uncoated end sections of a first and second pipe 20 A and 20 B at a weld site where the first and second pipes were welded together, comprising:
a) a blasting containment device 12 having:
i) a fixed portion 22 , having:
a. a releasable holder 66 that releasably attaches to the first pipe 20 A, to hold the fixed portion 22 in position during blasting operation;
b. a motor 40 , coupled to the fixed portion 22 ;
c. a linkage system 42 , 44 , 46 , 50 , with one end coupled to the motor 40 ;
ii) a rotating containment portion 24 rotatably mounted to the fixed portion 22 , and releasably and rotatively coupled to the second pipe 20 B; having:
a. a linkage engagement portion 48 , coupled to a second end of the linkage system 42 , 44 , 46 , 50 ;
b. a blasting nozzle 27 , directed at the weld site;
c. a vacuum hose 38 , oriented to suck out airborne dust;
d. a support device 68 , abutting to the second pipe 20 B, positioned to rotatively move around the second pipe as the rotating containment portion 24 circumferentially moves around the second pipe;
b) a support devices system 106 , coupled to the blasting containment device 12 via connections 107 , including:
i) a blasting device 16 , coupled to the blasting containment portion 22 via a blasting material delivery hose 36 and the material blasting nozzle 27 , to enable delivery of blasting material 72 to the material blasting nozzle 27 at high air pressure and speed, and thereby impacting the weld site 11 with the blasting material 72 ;
ii) a vacuum device 18 , coupled to the blasting containment device 12 , via a vacuum port 37 , to enable resulting dust 62 to be vacuumed out of the blasting containment device after impacting the weld site 11 with the blasting material 72 ; and
iii) an electrical power generator 14 , electrically coupled via electrical cord 34 to the grit blasting containment device 12 , the grit blasting device 16 , and the grit vacuum device 18 to enable electrical power to be provided thereto; and
c) a lateral movement system, coupled to the blasting containment device 12 , having:
iv) a first position that holds the grit blasting containment device 12 in a fixed position as the grit blasting containment device blasts particles circumferentially around the two pipes;
v) a second position that moving the grit blasting containment device off of the two pipes; and
vi) a third position that provides movement of the grit blasting containment device along the two pipes.
2 . The system of claim 1 , wherein the lateral movement system includes:
a) a first and second releasable holder devices 35 , mounted to the fixed portion 22 and rotating containment portion 24 respectively; b) a connector 33 , inserted through the releasably first and second holder devices 35 ; and c) a vehicle 100 with a lifting device 101 that is releasably couplable to the connector 35 .
3 . The system of claim 1 , wherein lateral movement device includes a remote controlled vehicle 170 , coupled to the grit blasting containment device 12 , and positioned on a top portion of the pipeline 20 during movement thereof, having a carriage 175 , movable into a first position that moves the grit blasting containment device 12 along the pipeline 20 .
4 . The system of claim 3 , further includes:
a) a camera 133 , mounted to the rotatable containment portion 24 oriented to send real time images of the pipeline 20 relative positioning thereto, and to enable proper alignment of the blasting nozzle 27 with the welding site 11 ; and b) a remote viewing system 200 , in controlling communication with the remote controlled vehicle 170 , sending controlling signals to the remote controlled vehicle 170 to move the grit blasting containment device 12 forward and backward along the pipeline 20 .
5 . A method 150 of progressive welding, cleaning and coating a pipeline, comprising the steps of:
a) providing at least a first, second, third, and forth pipe, each progressively lined up end to end, wherein the site of the first and second abutting pipe ends 111 are not welded, the site of the second and third abutting pipe ends 11 are welded, and the site of the third and forth abutting pipe ends 122 are welded and cleaned;
b) providing a welding system 110 at the site of the first and second abutting pipe ends 111 ;
c) providing a blasting containment device 12 at the site of the second and third abutting pipe ends 11 , that is removably coupled around the second and third pipe ends 11 ;
d) providing a pipe protective coating application system 120 at the site of the third and forth abutting pipe ends 122 ;
d) providing a blasting containment device moving system;
e) welding the first and second abutting pipe ends with the welding system 110 ;
f) blasting the second and third abutting pipe ends 11 with the blasting containment device 12 without allowing dust from the blasting to escape from the blasting containment device 12 ;
g) coating the third and forth abutting pipe ends 122 using the pipe protective coating application system 120 ; and
h) after completing the welding, blasting and coating steps, performing the following steps:
i) releasing the blasting containment device 12 from being coupled around the second and third pipe ends 11 ;
ii) moving the welding system 110 to a subsequent site where two subsequent pipe ends are not welding together;
iii) moving the blasting containment device 12 , via the blasting containment device moving system, to a subsequent site where two subsequent pipe ends are welded together but not coated by the pipe protective coating application system 120 ; and
iv) moving the pipe protective coating application system 120 to a subsequent site where two subsequent pipe ends were previously welded together and previously blasted by the blasting containment device 12 .
6 . The method of claim 5 , wherein the blasting containment device moving system includes a vehicle with a boom arm coupled to a cable attached to the blasting containment device 12 .
7 . The method of claim 5 , wherein the blasting containment device moving system includes a remote control vehicle mounted above the pipeline 20 and coupled to the blasting containment device 12 .
8 . The method of claim 7 , wherein the blasting containment device 12 is coupled to a support system 106 having: a power system 14 , a blasting material delivery system 16 , and a vacuum system 18 .Join the waitlist — get patent alerts