Methods and Apparatus for Switching Between Bandwidth Parts
Abstract
A user equipment (UE) receives control signaling in a scheduling bandwidth part (BWP). The control signaling indicates switching from a first active BWP to a second active BWP or switching from a first active BWP pair to a second active BWP pair for the UE. The control signaling aligns with a time unit boundary, such as a slot boundary, that is associated with the scheduling BWP. In the event that a scheduled BWP for a UE has a different numerology than a scheduling BWP that is currently active for the UE, the UE could switch from the scheduling BWP to the scheduled BWP based on a control signaling monitoring periodicity of the scheduled BWP.
Claims
exact text as granted — not AI-modifiedWhat is claimed is:
1 . A method comprising:
receiving, by a user equipment (UE), a control signaling in a scheduling bandwidth part (BWP), wherein the control signaling indicates switching from a first active BWP to a second active BWP or switching from a first active BWP pair to a second active BWP pair for the UE, and wherein the control signaling aligns with a boundary associated with the scheduling BWP.
2 . The method of claim 1 , wherein the boundary associated with the scheduling BWP is a slot of the scheduling BWP.
3 . The method of claim 1 , wherein the first active BWP is a first active downlink (DL) BWP and the second active BWP is a second active DL BWP.
4 . The method of the claim 1 , wherein the first active BWP is the same as the scheduling BWP.
5 . The method of claim 1 , wherein the first active BWP is a first uplink (UL) BWP and the second active BWP is a second active UL BWP.
6 . The method of claim 1 , wherein the first active BWP pair comprises a third active DL BWP and a third active UL BWP, and wherein the second active BWP pair comprises a fourth active DL BWP and a fourth active UL BWP.
7 . The method of claim 6 , wherein the third active DL BWP is the same as the scheduling BWP.
8 . The method of claim 7 , wherein the second active BWP has a different numerology than the first active BWP, wherein the fourth active DL BWP has a different numerology than the third active DL BWP, or wherein the fourth active UL BWP has a different numerology than the third active UL BWP.
9 . A user equipment (UE) comprising:
a processor; and a non-transitory processor-readable storage medium storing instructions for execution by the processor, the instructions causing the processor to perform a method comprising:
receiving a control signaling in a scheduling bandwidth part (BWP),
wherein the control signaling indicates switching from a first active BWP to a second active BWP or switching from a first active BWP pair to a second active BWP pair for the UE, and
wherein the control signaling aligns with a boundary associated with the scheduling BWP.
10 . The UE of claim 9 , wherein the boundary associated with the scheduling BWP is a slot of the scheduling BWP.
11 . The UE of claim 9 , wherein the first active BWP is a first active downlink (DL) BWP and the second active BWP is a second active DL BWP.
12 . The UE of the claim 9 , wherein the first active BWP is the same as the scheduling BWP.
13 . The UE of claim 9 , wherein the first active BWP is a first uplink (UL) BWP and the second active BWP is a second active UL BWP.
14 . The UE of claim 9 , wherein the first active BWP pair comprises a third active DL BWP and a third active UL BWP, and wherein the second active BWP pair comprises a fourth active DL BWP and a fourth active UL BWP.
15 . The UE of claim 14 , wherein the third active DL BWP is the same as the scheduling BWP.
16 . The UE of claim 15 , wherein the second active BWP has a different numerology than the first active BWP, wherein the fourth active DL BWP has a different numerology than the third active DL BWP, or wherein the fourth active UL BWP has a different numerology than the third active UL BWP.
17 . A method comprising:
transmitting, by a network equipment to a user equipment (UE), a control signaling in a scheduling bandwidth part (BWP), wherein the control signaling indicates switching from a first active BWP to a second active BWP or switching from a first active BWP pair to a second active BWP pair for the UE, and wherein the control signaling aligns with a boundary associated with the scheduling BWP.
18 . The method of claim 17 , wherein the boundary associated with the scheduling BWP is a slot of the scheduling BWP.
19 . The method of claim 17 , wherein the first active BWP is a first active downlink (DL) BWP and the second active BWP is a second active DL BWP.
20 . The method of the claim 17 , wherein the first active BWP is the same as the scheduling BWP.
21 . The method of claim 17 , wherein the first active BWP is a first uplink (UL) BWP and the second active BWP is a second active UL BWP.
22 . The method of claim 17 , wherein the first active BWP pair comprises a third active DL BWP and a third active UL BWP, and wherein the second active BWP pair comprises a fourth active DL BWP and a fourth active UL BWP.
23 . The method of claim 22 , wherein the third active DL BWP is the same as the scheduling BWP.
24 . A network equipment comprising:
a processor; and a non-transitory processor-readable storage medium storing instructions for execution by the processor, the instructions causing the processor to perform a method comprising:
transmitting, to a user equipment (UE), a control signaling in a scheduling bandwidth part (BWP),
wherein the control signaling indicates switching from a first active BWP to a second active BWP or switching from a first active BWP pair to a second active BWP pair for the UE, and
wherein the control signaling aligns with a boundary associated with the scheduling BWP.
25 . The method of claim 24 , wherein the boundary associated with the scheduling BWP is a slot of the scheduling BWP.
26 . The method of claim 24 , wherein the first active BWP is a first active downlink (DL) BWP and the second active BWP is a second active DL BWP.
27 . The method of the claim 24 , wherein the first active BWP is the same as the scheduling BWP.
28 . The method of claim 24 , wherein the first active BWP is a first uplink (UL) BWP and the second active BWP is a second active UL BWP.
29 . The method of claim 24 , wherein the first active BWP pair comprises a third active DL BWP and a third active UL BWP, and wherein the second active BWP pair comprises a fourth active DL BWP and a fourth active UL BWP.
30 . The method of claim 29 , wherein the third active DL BWP is the same as the scheduling BWP.Join the waitlist — get patent alerts
Track US2019349963A1 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.