US2019078281A1PendingUtilityA1
Platform for offshore installation
Est. expirySep 12, 2037(~11.1 yrs left)· nominal 20-yr term from priority
B66C 23/52E02B 17/021B66C 23/185E02B 2017/006E02B 17/027E02B 2017/0056E02B 17/0836E02B 2017/0091
34
PatentIndex Score
0
Cited by
0
References
0
Claims
Abstract
A method to manufacture a platform for offshore installation by determining one or more properties selected from a group consisting of a desired length, a cargo tonnage requirement, a heavy lift capacity, total buoyancy, and an operating depth of the platform, and designing a hull section, a first jack up rig, and a second jack up rig based on the determined properties. The first designed jack up rig is joined to a first end of the designed hull section, and the second designed jack up rig is joined to a second end of the designed hull section located opposite the first end.
Claims
exact text as granted — not AI-modifiedWhat is claimed:
1 . A platform for offshore installation comprising:
two or more jack up rigs; a hull section, wherein the two or more jack up rigs are fixed to a first end and a second end located opposite the first end of the hull section.
2 . The platform of claim 1 , wherein the first end and the second end of the hull section are joined to the two or more jack up rigs via bolts and flanges, welds, or combination thereof.
3 . The platform of claim 1 , wherein the two or more jack up rigs each have two or more legs of a length of 5 to 200 meters.
4 . The platform of claim 1 , wherein the two or more jack up rigs have been retrofitted or reconditioned for reuse.
5 . The platform of claim 1 , wherein the hull has been retrofitted or reconditioned for reuse.
6 . The platform of claim 1 , wherein the two or more jack up rigs each have two or more legs of a length of 10 to 180 meters.
7 . The platform of claim 1 , wherein the hull comprises one or more materials selected from the group consisting of welded steel sheets, ABS steel, a steel having a high carbon content, a steel having a low carbon content, and one or more steel alloys.
8 . The platform of claim 1 , further comprising:
one or more cranes having a lift capacity up to 200 tons; one or more heavy lift cranes having a lift capacity up to or exceeding 1500 tons; and one or more retractable and steerable propellers.
9 . A method to manufacture a platform for offshore installation, the method comprising:
determining one or more properties selected from a group consisting of a desired length, a cargo tonnage requirement, a heavy lift capacity, total buoyancy, and an operating depth of the platform; designing a hull section, a first jack up rig, and a second jack up rig based on the determined properties; joining the first designed jack up rig to a first end of the designed hull section; and joining the second designed jack up rig to a second end of the designed hull section, the second end located opposite the first end.
10 . The method of claim 9 , wherein designing the first and second jack up rigs comprises independently selecting a newly built jack up rig, a decommissioned jack up rig, or a refurbished jack up rig.
11 . The method of claim 9 , wherein joining the first jack up rig and joining the second jack up rig to comprises one or more flanges and bolts, welding, or a combination thereof.
12 . The method of claim 9 , further comprising: attaching one or more of light duty cranes, heavy lift cranes, a helideck, living accommodations, cargo deck space, propellers, buoyancy chambers, ballast chambers, and extendable legs to the platform.Join the waitlist — get patent alerts
Track US2019078281A1 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.