A thermal barrier and air barrier system is described.
Claims
exact text as granted — not AI-modifiedWhat is claimed is:
1 . A wall system comprising:
a thermally resistant steel stud; and spray foam insulation on a side of the steel stud.
2 . The wall system of claim 1 , wherein the system includes a plurality of thermally resistant steel studs arranged in a wall format and a foam board on the side of the side of the steel stud.
3 . The wall system of claim 2 , further comprising an air barrier adjacent to the foam board.
4 . The wall system of claim 3 , further comprising a batt insulation between the steel studs.
5 . A method of building a thermally resistant wall comprising:
installing a plurality of thermally resistant steel studs to form a cavity; and spraying foam insulation to fill the cavity with foam insulation that passes through voids of the thermally resistant steel studs.
6 . A wall comprising a thermally resistant steel stud, spray foam insulation, and an air barrier on an outer surface of the wall.Join the waitlist — get patent alerts