US2018112368A1PendingUtilityA1

Method for improving ground

Assignee: DAISHO CHEMICAL R&D INCPriority: Oct 3, 2014Filed: May 27, 2015Published: Apr 26, 2018
Est. expiryOct 3, 2034(~8.1 yrs left)· nominal 20-yr term from priority
Inventors:Ataru Haneda
E02D 2250/003E02D 5/66E02D 3/12E02D 5/46
8
PatentIndex Score
0
Cited by
0
References
0
Claims

Abstract

A method for improving ground is capable of preventing a clod whose representative size is large from remaining in the ground. The method for improving ground includes cutting a ground by injecting a cutting fluid (e.g. high-pressure water or high-pressure air: including a case where a solidification material is injected) from jet devices, feeding a solidification material, mixing the cut ground, the cutting fluid and the solidification material, and agitating a mixture thereof to form an underground consolidated body. A plurality of nozzles are located at an interval in a vertical direction in the jet devices, and when the cutting fluid is injected, a cutting fluid is injected from an upward nozzle in a downward skewed direction, and a cutting fluid is injected from a downward nozzle in an upward skewed direction.

Claims

exact text as granted — not AI-modified
1 . A method for improving ground comprising the steps of: cutting a ground by injecting a cutting fluid from jet devices; feeding a solidification material; mixing a cut ground, the cutting fluid and the solidification material; and agitating a mixture thereof to form an underground consolidated body, wherein
 a plurality of nozzles are located at an interval in a vertical direction in the jet devices, and when the cutting fluid is injected, a cutting fluid jet is injected from an upward nozzle in a downward skewed direction, and a cutting fluid jet is injected from a downward nozzle in an upward skewed direction.   
     
     
         2 . The method for improving ground according to  claim 1 , wherein the method for improving ground comprises a step of adjusting the angle of the nozzles. 
     
     
         3 . The method for improving ground according to  claim 1 , wherein the method for improving ground comprises a step of adjusting the interval between the nozzles in a vertical direction. 
     
     
         4 . The method for improving ground according to  claim 2 , wherein the method for improving ground comprises a step of adjusting the interval between the nozzles in a vertical direction.

Join the waitlist — get patent alerts

Track US2018112368A1 — get alerts on status changes and closely related new filings.

We store only your email — no account needed. See our privacy policy.