US2018103562A1PendingUtilityA1

Data center facility design configuration

Assignee: SWITCH LTDPriority: Mar 15, 2013Filed: Oct 16, 2017Published: Apr 12, 2018
Est. expiryMar 15, 2033(~6.6 yrs left)· nominal 20-yr term from priority
Inventors:Rob Roy
H05K 7/20827H05K 7/20745
58
PatentIndex Score
0
Cited by
0
References
0
Claims

Abstract

One data center embodiment comprising a building having a plurality of rooms and first and second exterior load walls disposed on opposite sides of the building, a plurality of air handler and fluid cooler devices exterior to the building along the first exterior load wall, and a plurality of condenser unit devices exterior to the building along the second exterior load wall. Also part of the data center is a data sector inside the building that is adjacent to the first exterior load wall and three separate UPS and substation distribution equipment rooms, each containing UPS and substation distribution equipment therein. Also included is air conditioning equipment that is connected to certain of the plurality of condenser unit devices, and a power spine room between the three separate UPS and substation distribution equipment rooms and the data sector such that the power spine room including a plurality of PDU devices.

Claims

exact text as granted — not AI-modified
What is claimed is: 
     
         1 . A data center comprising:
 a building having a plurality of rooms and first and second exterior load walls disposed on opposite sides of the building;   a plurality of air handler and fluid cooler devices disposed exterior to the building along the first exterior load wall;   a plurality of condenser unit devices disposed exterior to the building along the second exterior load wall;   a data sector disposed inside the building, adjacent to the first exterior load wall;   three separate UPS and substation distribution equipment rooms, each containing UPS and substation distribution equipment therein, as well as air conditioning equipment that is connected to certain of the plurality of condenser unit devices; and   a power spine room disposed between the three separate UPS and substation distribution equipment rooms and the data sector, the power spine room including a plurality of PDU devices.