US2018041014A1PendingUtilityA1

Utility meter bypass systems, methods, and devices

Assignee: QFE 002 LLCPriority: Jun 23, 2015Filed: Apr 17, 2017Published: Feb 8, 2018
Est. expiryJun 23, 2035(~8.9 yrs left)· nominal 20-yr term from priority
Inventors:Paul Cruz
H02B 1/056H02B 1/04H02B 1/06H02B 1/03H02H 3/00H02H 7/22H02B 1/20G01R 22/065G01R 11/04G01R 1/36
41
PatentIndex Score
0
Cited by
0
References
0
Claims

Abstract

Bypass systems can be used to connect alternative energy sources to existing distribution panels without the need to replace or upgrade the distribution panel. Some such bypass systems may be integrated directly into an electric meter, while others can be connected to the meter but located laterally or otherwise away from the electric meter. The bypass busbars and breakers may in some devices be interchangeable, allowing for greater flexibility and capacity of the bypass systems.

Claims

exact text as granted — not AI-modified
1 . An electric meter bypass extension including at least one bypass breaker, the extension comprising:
 a housing including at least a first side, a portion of the first side of the housing being substantially planar;   a connection portion extending substantially parallel to the first side of the housing, the connection portion including a plurality of load-side conductive members configured to be placed in electrical contact with a portion of a circuit extending between the load side of an electric meter and a separate breaker panel; and   at least one bypass breaker disposed at least partially within the housing and in electrical communication with the plurality of load-side conductive members.   
     
     
         2 . The extension of  claim 1 , additionally comprising a plurality of line-side conductive members configured to transmit power from external power lines to a metering device, the plurality of line-side conductive members not connected within the extension to the plurality of load-side conductive members; 
     
     
         3 . An electrical system, comprising:
 a circuit breaker panel;   an electrical meter bypass extension including at least one bypass breaker, the extension comprising:
 a plurality of load-side conductive members configured to be placed in electrical contact with a portion of a circuit extending between the load side of an electric meter and a separate breaker panel; and 
 at least one bypass breaker disposed at least partially within the housing and in electrical communication with the plurality of load-side conductive members, the at least one bypass breaker configured to receive power from an alternative energy source; 
   a battery in electrical communication with the circuit breaker panel; and   an inverter in electrical communication with the circuit breaker panel and configured to convert DC power from the battery into AC power.

Join the waitlist — get patent alerts

Track US2018041014A1 — get alerts on status changes and closely related new filings.

We store only your email — no account needed. See our privacy policy.