Devices, methods, and systems for multi-user commissioning
Abstract
Devices, methods, and systems for multi-user commissioning are described herein. One system includes a mobile computing device comprising computer readable instructions stored thereon that are executable by a processor to: retrieve configuration data for a physical controller from a remote database, install the configuration data on the physical controller, receive data associated with a status of the physical controller after the configuration data is installed on the physical controller, and synchronize the data associated with the status of the physical controller with the remote database.
Claims
exact text as granted — not AI-modifiedWhat is claimed:
1 . A system for multi-user commissioning, comprising:
a mobile computing device comprising computer readable instructions stored thereon that are executable by a processor to:
retrieve configuration data for a physical controller from a remote database;
install the configuration data on the physical controller;
receive data associated with a status of the physical controller after the configuration data is installed on the physical controller; and
synchronize the data associated with the status of the physical controller with the remote database.
2 . The system of claim 1 , wherein the instructions are executable by the processor to receive a notification of a project associated with the physical controller.
3 . The system of claim 2 , wherein the notification includes a description of the project and a location of the physical controller.
4 . The system of claim 1 , wherein the configuration data configures a number of settings for functionality of the physical controller upon being installed on the physical controller.
5 . The system of claim 1 , wherein the remote database receives an input synchronization from a plurality of additional mobile computing devices for the project.
6 . The system of claim 1 , wherein the data associated with a status of the physical controller includes installation instructions for the physical controller and checkout instructions for the physical controller.
7 . The system of claim 1 , wherein the instructions are executable by the processor to record a number of tests on the physical controller and synchronize results from the number of tests with the remote database.
8 . A mobile computing device comprising computer readable instructions stored thereon that are executable by a processor to:
download project instructions for a project from a remote distributed database; generate a project checklist for the project based on the project instructions and information scanned from a device associated with the project; receive selectable inputs corresponding to the project checklist; and synchronize inputs for the project checklist with the remote distributed database.
9 . The mobile computing device of claim 8 , wherein the instructions are executable to request configuration data based on information scanned from a physical controller.
10 . The mobile computing device of claim 8 , wherein the project instructions include a location of the project.
11 . The mobile computing device of claim 8 , wherein the project checklist includes a wiring checkout instruction, a sensor calibration instruction, and a sequence validation instruction.
12 . The mobile computing device of claim 8 , wherein the instructions to synchronize inputs for the project checklist include instructions to synchronize inputs received from the device associated with the project via a connection between the device and the mobile computing device.
13 . A method for multi-user commissioning, comprising:
receiving, at a mobile computing device, a notification of a project associated with a physical controller; downloading, at the mobile computing device, project instructions for the project from a remote distributed database, wherein the project instructions includes configuration data for the physical controller; generating, at the mobile computing device, a project checklist for the project based on the project instructions for the project, wherein the project checklist includes instructions to upload the configuration data to the physical controller; updating, at the mobile computing device, the project checklist to include information relating to completed tasks associated with the project, wherein the completed tasks include uploading the configuration data to the physical controller; and synchronizing, at the mobile computing device, the project checklist with the remote distributed database.
14 . The method of claim 13 , comprising displaying, on a display of the mobile computing device, the generated project checklist.
15 . The method of claim 14 , comprising receiving inputs, at the display of the mobile computing device, corresponding to the project checklist upon completion of tasks associated with the project.
16 . The method of claim 13 , comprising calibrating the physical controller by uploading the configuration data to the physical controller.
17 . The method of claim 13 , wherein updating the project checklist includes inputting, at the display, test results for the project.
18 . The method of claim 13 , comprising displaying, at the display of the mobile computing device, an overview of progress for the project.
19 . The method of claim 13 , comprising switching, at the display of the mobile computing device, from the project to a different project.
20 . The method of claim 13 , comprising altering, at the mobile computing device, a number of functional settings for the physical controller.Join the waitlist — get patent alerts
Track US2018012173A1 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.