Pre-fabrication of a metal dormer provides for a one-step and relatively easy installation by a home owner, a roofing contractor or a carpenter. By using an aluminum alloy and specific forming and welding adaptations, a relatively water-tight, light and low-cost dormer may be readily pre-fabricated.
Claims
exact text as granted — not AI-modifiedWhat is claimed is:
1 . A method of pre-fabricating a dormer, the method comprising:
forming, by press-brake and according to a planned geometry, a plurality of dormer components from a metal material, the forming creating creases; cutting the dormer components to fit a roof on which the dormer is to be installed; spot-welding to form welds between the dormer components; sealing between the welds; and filling the creases with filling material.
2 . The method of claim 1 further comprising etching the metal material to show lines along which the cutting will occur.
3 . The method of claim 1 wherein the metal material comprises 5083 Aluminum alloy.
4 . The method of claim 1 wherein the metal material comprises 6061-T6 Aluminum alloy.
5 . The method of claim 1 wherein the filling material comprises Titanium Putty.
6 . The method of claim 1 further comprising sanding the filing material.
7 . The method of claim 1 further comprising anodizing the dormer.
8 . The method of claim 1 further comprising sandblasting the dormer.
9 . The method of claim 1 further comprising powder coating the dormer to a desired colour.
10 . The method of claim 1 wherein the forming creates dimples and the method further comprises filling the dimples with filling material.
11 . The method of claim 1 wherein the roof has a 9.25:12 pitch.
12 . The method of claim 1 wherein the roof has a 12:12 pitch.
13 . The method of claim 1 further comprising etching the dormer.
14 . The method of claim 1 further comprising anodizing the dormer.
15 . The method of claim 1 wherein the sealing between the spot-weld locations comprises caulking between the spot-weld locations.
16 . A dormer pre-fabricated by:
forming, by press-brake and according to a planned geometry, a plurality of dormer components from a metal material, the forming creating creases; cutting the dormer components to fit a roof on which the dormer is to be installed; spot-welding to form welds between the dormer components; sealing between the welds; and filling the creases with filling material.Join the waitlist — get patent alerts
Track US2017356186A1 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.