US2016312598A1PendingUtilityA1

Method and Criteria for Trajectory Control

Assignee: HALLIBURTON ENERGY SERVICES INCPriority: Jan 24, 2014Filed: Jan 24, 2014Published: Oct 27, 2016
Est. expiryJan 24, 2034(~7.5 yrs left)· nominal 20-yr term from priority
E21B 49/00E21B 47/06E21B 44/005E21B 47/022E21B 44/00E21B 7/04G05B 11/36E21B 41/00E21B 47/12E21B 41/0092E21B 47/07
50
PatentIndex Score
0
Cited by
0
References
0
Claims

Abstract

The disclosed embodiments include a method, apparatus, and computer program product configured to performing automated downhole wellbore trajectory control for correcting between an actual wellbore trajectory path and a planned wellbore trajectory path. For example, in one embodiment, a PID controller is configured to obtain real-time data gathered during the drilling operation, determine whether the actual wellbore trajectory path deviates from the planned wellbore trajectory path, and automatically initiate the downhole wellbore trajectory control to change the actual wellbore trajectory path to a modified correction path that is determined using a minimum incremental wellbore energy method.

Claims

exact text as granted — not AI-modified
1 . A computer-implemented method for performing automated downhole wellbore trajectory control for correcting between an actual wellbore trajectory path and a planned wellbore trajectory path, the method comprising:
 receiving real-time path data for determining the actual wellbore trajectory path;   receiving parameters for the planned wellbore trajectory path;   determining whether the actual wellbore trajectory path deviates from the planned wellbore trajectory path;   responsive to a determination that the actual wellbore trajectory path deviates from the planned wellbore trajectory path, determining whether the actual wellbore trajectory path deviates from a correction path;   responsive to a determination that the actual wellbore trajectory path deviates from the correction path;   determining a target point along the planned wellbore trajectory path for modifying the correction path;   determining trajectory correction parameters using a minimum incremental wellbore energy method; and   automatically initiating the downhole wellbore trajectory control to change the actual wellbore trajectory path to a modified correction path.   
     
     
         2 . The computer-implemented method of  claim 1 , further comprising determining a trend angle and a deviation vector length between the actual wellbore trajectory path and the planned wellbore trajectory path in determining whether the actual wellbore trajectory path deviates from the planned wellbore trajectory path. 
     
     
         3 . The computer-implemented method of  claim 1 , further comprising determining a vertical shaft deflection and horizontal shaft deflection for changing the actual wellbore trajectory path to the modified correction path. 
     
     
         4 . The computer-implemented method of  claim 1 , wherein the real-time path data includes measured depth (MD), horizontal departure along south-north direction (X), horizontal departure along west-east direction (Y), true vertical depth (Z), inclination angle (α), azimuth angle (φ), and tool face angle. 
     
     
         5 . The computer-implemented method of  claim 1 , wherein the parameters of the planned wellbore trajectory path includes measured depth (MD), horizontal departure along south-north direction (X), horizontal departure along west-east direction (Y), true vertical depth (Z), inclination angle (α), azimuth angle (φ), pay zone location, and maximum dogleg severity. 
     
     
         6 . The computer-implemented method of  claim 3 , further comprising initiating a first actuator for performing the vertical shaft deflection and initiating a second actuator for performing the horizontal shaft deflection for changing the actual wellbore trajectory path to the modified correction path. 
     
     
         7 . The computer-implemented method of  claim 1 , wherein the minimum incremental wellbore energy method is a balanced tangential method. 
     
     
         8 . The computer-implemented method of  claim 1 , wherein the minimum incremental wellbore energy method is a minimum curvature method. 
     
     
         9 . The computer-implemented method of  claim 1 , wherein the minimum incremental wellbore energy method is a natural curve method. 
     
     
         10 . A non-transitory computer readable medium comprising computer executable instructions for performing automated downhole wellbore trajectory control for correcting between an actual wellbore trajectory path and a planned wellbore trajectory path, the computer executable instructions when executed causes one or more machines to perform operations comprising:
 receiving real-time path data for determining the actual wellbore trajectory path;   receiving parameters for the planned wellbore trajectory path;   determining whether the actual wellbore trajectory path deviates from the planned wellbore trajectory path;   responsive to a determination that the actual wellbore trajectory path deviates from the planned wellbore trajectory path, determining whether the actual wellbore trajectory path deviates from a correction path;   responsive to a determination that the actual wellbore trajectory path deviates from the correction path;   determining a target point along the planned wellbore trajectory path for modifying the correction path;   determining trajectory correction parameters using a minimum incremental wellbore energy method; and   automatically initiating the downhole wellbore trajectory control to change the actual wellbore trajectory path to a modified correction path.   
     
     
         11 . The computer readable medium of  claim 10 , wherein the operations further comprises determining a trend angle and a deviation vector length between the actual wellbore trajectory path and the planned wellbore trajectory path in determining whether the actual wellbore trajectory path deviates from the planned wellbore trajectory path. 
     
     
         12 . The computer readable medium of  claim 10 , wherein the operations further comprises determining a vertical shaft deflection and horizontal shaft deflection for changing the actual wellbore trajectory path to the modified correction path. 
     
     
         13 . The computer readable medium of  claim 10 , wherein the real-time path data includes measured depth (MD), horizontal departure along south-north direction (X), horizontal departure along west-east direction (Y), true vertical depth (Z), inclination angle (α), azimuth angle (φ), and tool face angle. 
     
     
         14 . The computer readable medium of  claim 10 , wherein the parameters of the planned wellbore trajectory path includes measured depth (MD), horizontal departure along south-north direction (X), horizontal departure along west-east direction (Y), true vertical depth (Z), inclination angle (α), azimuth angle (φ), pay zone location, and maximum dogleg severity. 
     
     
         15 . The computer readable medium of  claim 12 , wherein the operations further comprises initiating a first actuator for performing the vertical shaft deflection and initiating a second actuator for performing the horizontal shaft deflection for changing the actual wellbore trajectory path to the modified correction path. 
     
     
         16 . The computer readable medium of  claim 10 , wherein the minimum incremental wellbore energy method is at least one of a balanced tangential method, a minimum curvature method, and a natural curve method. 
     
     
         17 . A proportional-integral-derivative (PID) controller for performing automated downhole wellbore trajectory control for correcting between an actual wellbore trajectory path and a planned wellbore trajectory path, the PID controller comprising:
 at least one processor; and   at least one memory coupled to the at least one processor and storing instructions that when executed by the at least one processor performs operations comprising:
 receiving real-time path data for determining the actual wellbore trajectory path; 
 receiving parameters for the planned wellbore trajectory path; 
 determining whether the actual wellbore trajectory path deviates from the planned wellbore trajectory path; 
 responsive to a determination that the actual wellbore trajectory path deviates from the planned wellbore trajectory path, determining whether the actual wellbore trajectory path deviates from a correction path; 
 responsive to a determination that the actual wellbore trajectory path deviates from the correction path; 
 determining a target point along the planned wellbore trajectory path for modifying the correction path; 
 determining trajectory correction parameters using a minimum incremental wellbore energy method; and 
 automatically initiating the downhole wellbore trajectory control to change the actual wellbore trajectory path to a modified correction path. 
   
     
     
         18 . The PID controller of  claim 17 , wherein the operations further comprises:
 determining a trend angle and a deviation vector length between the actual wellbore trajectory path and the planned wellbore trajectory path in determining whether the actual wellbore trajectory path deviates from the planned wellbore trajectory path.   
     
     
         19 . The PID controller of  claim 17 , wherein the operations further comprises:
 determining a vertical shaft deflection and horizontal shaft deflection for changing the actual wellbore trajectory path to the modified correction path; and   initiating a first actuator for performing the vertical shaft deflection and initiating a second actuator for performing the horizontal shaft deflection for changing the actual wellbore trajectory path to the modified correction path.   
     
     
         20 . The PID controller of  claim 17 , wherein the minimum incremental wellbore energy method is at least one of a balanced tangential method, a minimum curvature method, and a natural curve method.

Join the waitlist — get patent alerts

Track US2016312598A1 — get alerts on status changes and closely related new filings.

We store only your email — no account needed. See our privacy policy.