US2016312592A1PendingUtilityA1
Sw-sagd with between heel and toe injection
Est. expiryApr 27, 2035(~8.7 yrs left)· nominal 20-yr term from priority
E21B 43/2406E21B 33/12E21B 43/162E21B 43/305E21B 17/203
36
PatentIndex Score
0
Cited by
0
References
0
Claims
Abstract
The present disclosure relates to a particularly effective well configuration that can be used for single well steam assisted gravity drainage (SW-SAGD), wherein steam injection occurs at one or more points between the heel and toe, instead of at the toe as in the prior art.
Claims
exact text as granted — not AI-modified1 ) A method of producing heavy oils from a reservoir by single well steam and gravity drainage (SW-SAGD), comprising:
a) providing a horizontal well below a surface of a reservoir; b) said horizontal well having a toe end and a heel end and a middle therebetween; c) injecting steam into one or more injection points between said toe end and said heel end; and d) simultaneously producing mobilized heavy oil; e) wherein said method produces more oil at a time point than a similar SW-SAGD well with steam injection only at said toe.
2 ) The method of claim 1 , wherein each injection point is separated from a production segment by at least two thermal packers.
3 ) The method of claim 1 , wherein an injection point is at said middle.
4 ) The method of claim 1 , wherein two injection points are at about ¼ and ¾ of a horizontal length of said well.
5 ) The method of claim 1 , wherein injected steam includes solvent.
6 ) The method of claim 1 , wherein said method includes a preheating phase wherein steam is injected along the entire length of the well.
7 ) The method of claim 1 , wherein said method includes a cyclic preheating phase comprising a steam injection period along the entire length of the well followed by a soaking period.
8 ) The method of claim 7 , including two cyclic preheating phases.
9 ) The method of claim 7 , including three cyclic preheating phases.
10 ) The method of claim 1 , wherein said method includes a pre-heating phase comprising a steam injection in both the injection segment and the production segment followed by a soaking period.
11 ) The method of claim 10 , including two cyclic pre-heating phases.
12 ) The method of claim 10 , including three cyclic pre-heating phases.
13 ) The method of claim 7 , wherein said soaking period is 10-30 days.
14 ) The method of claim 7 , wherein said soaking period is 20 days.
15 ) A well configuration for producing heavy oils from a reservoir by single well steam and gravity drainage (SW-SAGD), comprising:
a) a horizontal well in a subsurface reservoir; b) said horizontal well having a toe end and a heel end and having at least three segments comprising:
i) at least two production segments bracketing at least one injection segment;
ii) said production segments fitted for production; and
iii) said injection segments fitted for injection.
16 ) The well configuration of claim 15 , wherein thermal packers separate said injection segments and said production segments.
17 ) The well configuration of claim 15 , comprising two injection segments bracketed by production segments.
18 ) The well configuration of claim 16 , wherein said two injection segments are at about ¼ and ¾ of an overall well length.
19 ) The well configuration of claim 17 , said at least two injection segments fitted with coiled tubing having two orifices to inject steam into said two injection segments.
20 ) The well configuration of claim 15 , comprising three injection segments bracketed by production segments.
21 ) An improved method of producing heavy oils from a SW-SAGD, wherein steam is injected into a toe end of a horizontal well to mobilize oil which is simultaneously produced at a heel end of said horizontal well, the improvement comprising providing one or more injection points for steam between said heel end and said toe end during a production phase, thus improving a CSOR of said horizontal well at a time period as compared to a similar well with steam injection only at said toe end during said production phase.Join the waitlist — get patent alerts