US2016303655A1PendingUtilityA1

Method for producing a green compact from a powdered or ganular material

Assignee: HILTI AGPriority: Apr 20, 2011Filed: Jun 23, 2016Published: Oct 20, 2016
Est. expiryApr 20, 2031(~4.8 yrs left)· nominal 20-yr term from priority
B22F 3/004C04B 35/62605C04B 2235/427C04B 2235/604B22F 3/03B30B 11/005Y10S100/903B21D 22/22B30B 15/04B30B 11/027B30B 15/306
46
PatentIndex Score
0
Cited by
0
References
0
Claims

Abstract

A method for producing a green compact from a powdered or granular material is disclosed. An embodiment of the method includes moving a fill shoe, which is filled with powdered or granular material, by an adjusting device from a first park position to a first end position. The fill shoe is moved from the first end position to a second end position over a construction chamber and the construction chamber is filled with the powdered or granular material in the fill shoe in a layer. The fill shoe is moved from the second end position to a second park position after filling the construction chamber with the layer, where the second park position is different from the first park position.

Claims

exact text as granted — not AI-modified
What is claimed is: 
     
         1 . A method for producing a green compact from a powdered or granular material, comprising the steps of:
 moving a fill shoe, which is filled with powdered or granular material, by an adjusting device from a first park position to a first end position;   moving the fill shoe from the first end position to a second end position over a construction chamber and filling the construction chamber with the powdered or granular material in the fill shoe in a layer; and   moving the fill shoe from the second end position to a second park position after filling the construction chamber with the layer, wherein the second park position is different from the first park position.   
     
     
         2 . The method according to  claim 1 , further comprising the steps of:
 moving the fill shoe, which is filled with powdered or granular material, by the adjusting device from the second park position to the second end position;   moving the fill shoe from the second end position to the first end position over the construction chamber and filling the construction chamber with the powdered or granular material in the fill shoe in a second layer; and   moving the fill shoe from the first end position to the first park position after filling the construction chamber with the second layer.   
     
     
         3 . The method according to  claim 1 , wherein a first speed at which the fill shoe is moved from the first park position to the first end position and/or the second end position to the second park position is greater than a speed at which the fill shoe is moved from the first end position to the second end position.

Join the waitlist — get patent alerts

Track US2016303655A1 — get alerts on status changes and closely related new filings.

We store only your email — no account needed. See our privacy policy.