US2016251947A1PendingUtilityA1
Methods of Modifying Formation Properties
Assignee: SCHLUMBERGER TECHNOLOGY CORPPriority: Feb 27, 2015Filed: Feb 23, 2016Published: Sep 1, 2016
Est. expiryFeb 27, 2035(~8.6 yrs left)· nominal 20-yr term from priority
E21B 43/26E21B 43/285E21B 43/16E21B 43/00
37
PatentIndex Score
0
Cited by
0
References
0
Claims
Abstract
A method for modifying formation properties is disclosed. The method may include drilling a first wellbore into a first geologic layer. The first geologic layer may be in proximity to a second geologic layer. The method may also include removing material from the first geologic layer using a first material removal process. The properties of the first geologic layer may be changed and the properties of the second geologic layer may be changed.
Claims
exact text as granted — not AI-modified1 . A method for modifying formation properties, comprising:
drilling a first wellbore into a first geologic layer in proximity to a second geologic layer; removing material from the first geologic layer using a first material removal process; changing properties of the first geologic layer; and changing properties of the second geologic layer.
2 . The method for modifying formation properties of claim 1 , wherein the first geologic layer includes a salt formation and the first material removal process includes solution mining the salt formation.
3 . The method for modifying formation properties of claim 1 , wherein the changing of the properties of the first geologic layer induces the changing of the properties of the second geologic layer.
4 . The method for modifying formation properties of claim 1 , further comprising:
drilling a second wellbore into the first geologic layer; and removing material from the first geologic layer using a second material removal process.
5 . The method for modifying formation properties of claim 4 , wherein the first material removal process is the same as the second material removal process.
6 . The method for modifying formation properties of claim 1 , wherein the first material removal process includes acidizing the first geologic layer.
7 . The method for modifying formation properties of claim, 1 further comprising:
pressurizing the first geologic layer after removing the material from the first geologic layer using the first material removal process.
8 . The method for modifying formation properties of claim 1 , wherein changing the properties of the second geologic layer includes inducing fractures within the second geologic layer.
9 . The method for modifying formation properties of claim 1 , further comprising:
hydraulically fracturing the second geologic layer.
10 . The method for modifying formation properties of claim 9 , wherein the hydraulic fracturing of the second geologic layer occurs after the changing the properties of the second geologic layer.
11 . A method for modifying formation properties, comprising:
drilling a wellbore into a mineral layer in proximity to a hydrocarbon reservoir; removing material from the mineral layer using a material removal process; changing properties of the mineral layer; and changing properties of the hydrocarbon reservoir.
12 . The method for modifying formation properties of claim 11 , wherein the mineral layer includes a salt formation and the material removal process includes solution mining the salt formation.
13 . The method for modifying formation properties of claim 11 , wherein the changing of the properties of the mineral layer includes inducing the changing of the properties of the hydrocarbon reservoir.
14 . The method for modifying formation properties of claim 13 , wherein the changing of the properties of the hydrocarbon reservoir increases completion quality of the hydrocarbon reservoir.
15 . The method for modifying formation properties of claim 14 , further comprising extracting hydrocarbons from the hydrocarbon reservoir.
16 . The method for modifying formation properties of claim 11 , wherein changing the properties of the hydrocarbon reservoir includes inducing fractures within the hydrocarbon reservoir and increasing permeability of the hydrocarbon reservoir.
17 . The method for modifying formation properties of claim 15 , wherein removing material from the mineral layer using a material removal process occurs while extracting hydrocarbons from the hydrocarbon reservoir.
18 . The method for modifying formation properties of claim 15 , wherein changing the properties of the hydrocarbon reservoir occurs while extracting hydrocarbons from the hydrocarbon reservoir.
19 . The method for modifying formation properties of claim 11 , wherein the mineral layer is located below the hydrocarbon reservoir.
20 . The method for modifying formation properties of claim 11 , wherein the mineral layer includes a carbonate formation and the material removal process includes acidizing the carbonate formation.Join the waitlist — get patent alerts
Track US2016251947A1 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.