US2016236756A1PendingUtilityA1
Tandem and side-by-side mooring offlaoding systems and associated methods
Est. expirySep 18, 2033(~7.2 yrs left)· nominal 20-yr term from priority
B63B 2035/448B63B 21/50B63B 35/44B63B 27/30B63B 21/20B63B 22/025B63B 27/34B63B 2021/206
35
PatentIndex Score
0
Cited by
0
References
0
Claims
Abstract
A mooring system comprising: an offshore structure comprising one or more hawsers; a vessel; a first mooring line; and a second mooring line.
Claims
exact text as granted — not AI-modified1 . A mooring system comprising: an offshore structure comprising one or more hawsers; a vessel; a first mooring line; and a second mooring line.
2 . The mooring system of claim 1 , wherein the offshore structure is a floating liquid natural gas facility.
3 . The mooring system of claim 1 , wherein the vessel is a liquid natural gas carrier vessel.
4 . The mooring system of claim 1 , wherein the first and second mooring lines are anchored to a sea floor.
5 . The mooring system of claim 1 , wherein the first and second mooring lines each comprise a buoy and a marker buoy.
6 . The mooring system of claim 1 , wherein the first and second mooring lines are connected to each other via a chord line.
7 . The mooring system of claim 1 , wherein the vessel is connected to the first mooring line, the second mooring line, and the one or more hawsers.
8 . The mooring system of claim 7 , wherein the vessel and the offshore structure are parallel to each other.
9 . The mooring system of claim 7 , wherein the vessel and the offshore structure are perpendicular to each other.
10 . A method for mooring a vessel comprising: providing a vessel; providing an offshore structure comprising one or more hawsers; providing a first mooring line; providing a second mooring line; attaching the first mooring line to the vessel; attaching the second mooring line to the vessel; and attaching the one or more hawsers to the vessel.
11 . The method of claim 10 , wherein the offshore structure is a floating liquid natural gas facility.
12 . The method of claim 10 wherein the vessel is a liquid natural gas carrier vessel.
13 . The method of claim 10 , wherein the first and second mooring lines are anchored to a sea floor.
14 . The method of claim 10 , wherein the first and second mooring lines each comprise a buoy and a marker buoy.
15 . The method of claim 10 , wherein the first and second mooring lines are connected to each other via a chord line.
16 . The method of claim 10 , further comprising orienting the vessel parallel with the offshore structure.
17 . The method of claim 10 , further comprising orienting the vessel perindicular to the offshore structure.
18 . A method for offloading oil and/or gas from a structure comprising: providing a side-by-side mooring system comprising an offshore structure comprising two hawsers, a vessel, a first mooring line, and a second mooring line, connecting the vessel to the first mooring line, the second mooring line, and the two hawsers in a side-by-side arrangement; transferring oil and/or gas from the structure to the vessel; and disconnecting the vessel from the first mooring line, the second mooring line, and the two hawsers.
19 . A method for offloading oil and/or gas from a structure comprising: providing a tandem mooring system comprising an offshore structure comprising a hawser, a vessel, a first mooring line, a second mooring line, and a hawser; connecting the vessel to the first mooring line, the second mooring line, and the hawser in a tandem arrangement; transferring oil and/or gas from the structure to the vessel; and
disconnecting the vessel from the first mooring line, the second mooring line, and the hawser.Join the waitlist — get patent alerts