US2016176414A1PendingUtilityA1

Power management system for train

Assignee: ELECTRO MOTIVE DIESEL INCPriority: Mar 2, 2016Filed: Mar 2, 2016Published: Jun 23, 2016
Est. expiryMar 2, 2036(~9.6 yrs left)· nominal 20-yr term from priority
B61C 3/02B60L 50/61Y02T10/70B60L 15/2045Y02T30/00B60L 50/10Y02T10/62B61L 25/025B60L 2240/622B60L 2200/26B60L 2260/26Y02T90/16Y02T10/72B61L 15/0058
37
PatentIndex Score
0
Cited by
0
References
0
Claims

Abstract

A power management system for managing power supply to a train having a locomotive with a primary power source for driving at least one railcar is provided. The power management system includes a Train Location Detecting System (TLDS) installed on the train to detect a location of the train, a storage battery on board the locomotive, a battery charging unit for charging the storage battery, and an automated power switching system for supplying power to the train. The storage battery is adapted to supply power to at least one of the locomotive and the at least one railcar. The automated power switching system is configured to switch to the storage battery for the power supply when the train enters a predetermined geographical zone, and to the primary power source for the power supply when the train leaves the predetermined geographical zone.

Claims

exact text as granted — not AI-modified
What is claimed is: 
     
         1 . A power management system for managing power supply to a train having a locomotive with a primary power source for driving at least one railcar, the power management system comprising:
 a Train Location Detecting System (TLDS) installed on the train to detect a location of the train;   a storage battery on board the locomotive, the storage battery being adapted to supply power to at least one of the locomotive and the at least one railcar;   a battery charging unit for charging the storage battery; and   an automated power switching system, in operable communication with the primary power source, the TLDS, and the storage battery, for supplying power to the train, the automated power switching system being configured to,
 switch to the storage battery for the power supply, when the train enters a predetermined geographical zone; and 
 switch to the primary power source for the power supply when the train leaves the predetermined geographical zone, wherein the location of the train is detected by the TLDS.

Join the waitlist — get patent alerts

Track US2016176414A1 — get alerts on status changes and closely related new filings.

We store only your email — no account needed. See our privacy policy.