Method and apparatus for assembly of a shoring tower
Abstract
Method for assembly of a shoring tower ( 26 ), which can be used for fabrication or reconstruction of buildings, comprising shoring struts ( 27 ) being connected with each other and at least one deck ( 1 )—for providing an area indented to be accessible in a shoring level (0, I, II, IV)—, wherein the deck ( 1 ) comprises at least one insertion hook ( 3 )—for hanging up on a particularly horizontal shoring strut ( 27 )—at a first front side ( 28 ) and an opposite second front side ( 29 ), characterized in that in a first step, a separate lifting and holding tool ( 20 ) being hookable in and out of a deck ( 1 ) is hooked in a deck ( 1 ) at a front side ( 28 ) of the deck ( 1 ), which is located within a first shoring level (I), preferably in an insertion position, which is provided for insertion respectively hanging up of a deck, defined by horizontal shoring struts ( 27 )—particularly two opposed shoring struts ( 27 )—in order to allow providing a horizontal area indented to be accessible, and in a second step, the lifting and holding tool ( 20 ) is hanged up on a particularly horizontal shoring strut ( 27 ) of a next higher second shoring level (II) such that the hooked in front side ( 28 ) of the deck ( 1 ) is hold by the lifting and holding tool ( 20 ) temporarily in an assembly distance ( 30 ) above the intended insertion position of the first shoring level (I) in a slanting intermediate assembly position not intended to be accessible, wherein the assembly distance ( 30 ) is particularly smaller than the distance between the first shoring level (I) and the second shoring level (II). A very easy and safe assembly and disassembly can thereby be achieved.
Claims
exact text as granted — not AI-modified1 . A method for assembly of a shoring tower ( 26 ), which can be used for fabrication or reconstruction of buildings, the shoring tower comprising shoring struts ( 27 ) being connected with each other and at least one deck ( 1 )—for providing an area indented to be accessible in a shoring level (0, I, II, IV)—, wherein the deck ( 1 ) comprises at least one insertion hook ( 3 ) for hanging up on a particularly horizontal shoring strut ( 27 )—at a first front side ( 28 ) and an opposite second front side ( 29 ), wherein the method includes
in a first step, a separate lifting and holding tool ( 20 ) being hookable in and out of a deck ( 1 ) is hooked in a deck ( 1 ) at a front side ( 28 ) of the deck ( 1 ), which is located within a first shoring level (I),
wherein in an insertion position, which is provided for insertion respectively hanging up of a deck, defined by two horizontal opposed shoring struts ( 27 ) in order to allow providing a horizontal area indented to be accessible, and
in a second step, the lifting and holding tool ( 20 ) is hanged up on a horizontal shoring strut ( 27 ) of a next higher second shoring level (II) such that the hooked in front side ( 28 ) of the deck ( 1 ) is hold by the lifting and holding tool ( 20 ) temporarily in an assembly distance ( 30 ) above the intended insertion position of the first shoring level (I) in a slanting intermediate assembly position not intended to be accessible, wherein the assembly distance ( 30 ) is smaller than the distance between the first shoring level (I) and the second shoring level (II).
2 . The method of claim 1 , wherein the assembly distance ( 30 ) amounts to at least 5 cm and at most 50 cm at substantially vertical orientation of the lifting and holding tool ( 20 ).
3 . The method of claim 1 , wherein the lifting and holding tool ( 20 ) can be hooked in and hooked out of a deck ( 1 ) as the lifting and holding tool ( 20 ) can be hooked in or hooked out of a lifting lock ( 2 ) of the deck ( 1 )—for locking of a deck ( 1 ) being inserted in an intended insertion position with the hanged up shoring strut ( 27 ) against unintended taking off—, which is arranged at a front side ( 28 , 29 ) of the deck ( 1 ), wherein the lifting lock ( 2 ) is configured such that the deck ( 1 ) can be lifted and simultaneously be unlocked or inserted in an intended insertion position and simultaneously be locked.
4 . The method of claim 1 , further comprising
in a third step, a second separate lifting and holding tool ( 20 ) being hookable in and out of a deck ( 1 ) is hooked in at a second opposite front side ( 29 ) of the deck and in a fourth step, the second lifting and holding tool ( 20 ) is hanged up on a shoring strut ( 27 ) of a next higher third shoring level (III) such that the hooked in second front side ( 29 ) of the deck is hold by the lifting and holding tool ( 20 ) temporarily in the assembly distance ( 30 ) above an intended insertion position in the second shoring level (II) as a slanting intermediate assembly position not intended to be accessible.
5 . The method of claim 4 , further comprising
in a fifth step, the first lifting and holding tool ( 20 ), which is hooked in the deck ( 1 ) at the first front side ( 28 ) of the deck, is detached from the shoring strut ( 27 ) of the second shoring level (II) and firstly lifted and thereafter lowering such that the deck ( 1 ) gets hanged up on a shoring strut ( 27 ) with the insertion hook ( 3 ) of the first front side ( 28 ) in the intended insertion position of the second shoring level (II) without providing a horizontal area intended to be accessible.
6 . The method of claim 5 , further comprising
In a sixth step, the second lifting and holding tool ( 20 ), which is hooked in the deck ( 1 ) at the second front side ( 29 ) of the deck, is detached from the shoring strut ( 27 ) of the third shoring level (III) and lowered such that the deck ( 1 ) gets hanged up with the insertion hook 3 of the second front side ( 29 ) on a shoring strut ( 27 ) in the intended insertion position of the second shoring level (II) in order to provide an horizontal area intended to be accessible.
7 . The method of claim 6 , wherein only two decks-can be inserted in one intended insertion position of a shoring level (0, I, II, III, IV) and
in a seventh step, the steps one to six are conducted also for a neighboring deck ( 31 ) of the first shoring level (I) in order to also hanging up the neighboring deck ( 31 ) of the first shoring level (I) with the insertion hooks ( 3 ) at the first and second front side ( 28 , 29 ) of the neighboring deck ( 31 ) on the opposing shoring struts ( 27 ) of the intended insertion position of the second shoring level (II).
8 . The method of claim 7 , wherein in the first shoring level (I) inserted neighboring deck ( 31 ) is used as working platform for moving up the deck ( 1 ) in the next higher second shoring level (II) by means of steps one to six and a deck ( 1 ) that has been before moved up in the second shoring level (II) is used as working platform for moving up the neighboring deck ( 31 ) from the first shoring level (I) in the next higher second shoring level (II) by means of step seven.
9 . The method of claim 1 , wherein an insertion of a deck ( 1 , 31 ) by hand in an intended insertion position of a shoring level (I) can only be conducted, when the next lower shoring level (0) is covered fully with one or more decks ( 1 , 31 ) or when the shoring level (I) is reachable from ground underlying the shoring tower.
10 . The method of claim 1 , wherein only every second shoring level (0, II, IV) is fully covered by one or more decks ( 1 , 31 ) after completed assembly of the shoring tower ( 26 ).
11 . The method of claim 1 , wherein a deck ( 1 , 31 ) is only inserted in an insertion position of a first shoring level (I) after an advancing side protection comprising shoring struts ( 27 ) of a side railing has been assembled at least up to the second shoring level (II).
12 . The method of claim 1 , wherein exactly two lifting and holding tools ( 20 ) are sufficient to assemble all decks ( 1 , 31 ) of a shoring tower ( 26 ).
13 . The method of claim 1 , wherein a distance between two shoring levels (I, II) amounts to at least 95 cm and at most 120 cm.
14 . A lifting and holding tool ( 20 ) for assembling a shoring tower ( 26 ), the lifting and holding tool ( 20 ) configured to be
hooked in a deck ( 1 ) at a front side ( 28 ) of the deck ( 1 ), which is located within a first shoring level (I), and hanged up on a horizontal shoring strut ( 27 ) of a next higher second shoring level (II) such that the hooked in front side ( 28 ) of the deck ( 1 ) is held by the lifting and holding tool ( 20 ) temporarily at an assembly distance ( 30 ) above the intended insertion position of the first shoring level (I) in a slanting intermediate assembly position not intended to be accessible, wherein the assembly distance ( 30 ) is particularly smaller than the distance between the first shoring level (I) and the second shoring level (II).
15 . The lifting and holding tool of claim 14 , wherein the lifting and holding tool ( 20 ) comprises a connection hook ( 25 ) for hooking in a deck ( 1 , 31 ) and a hang up hook ( 21 ) for hanging up on a particularly horizontal shoring strut ( 27 ), wherein the distance between the connection hook ( 25 ) and the hang up hook ( 21 ) corresponds to at least half and at most 95% of the distance between two shoring levels (I, II).
16 . The lifting and holding tool of claim 14 , wherein a hang up hook ( 21 ) included in the lifting and holding tool is directed towards the opposite direction of a connection hook ( 25 ) included in the lifting and holding tool, and at least one connection rod ( 23 , 24 ) is arranged in an upper area and one connection rod ( 22 ) in a lower area of the lifting and holding tool ( 20 ).
17 . The lifting and holding tool of claim 14 , wherein the lifting and holding tool ( 20 ) is configured to be hooked in a hinged manner in a deck ( 1 , 31 ), particularly in a hook-in-slot ( 5 ) of the deck ( 1 , 31 ), and is configured such that during vertical position of the lifting and holding tool ( 20 ) in a hinged manner hooked in deck ( 1 , 31 ) can be swiveled in a detaching-secured way in both directions for at least 80 degrees.
18 . The lifting and holding tool of claim 14 , wherein an end of a rod included in the lifting and holding tool forms a wide and flat connection hook ( 25 ) and the lifting and holding tool ( 20 ) comprises two rods that are arranged in parallel, which are connected through horizontal connection bars ( 22 , 23 , 24 ).
19 . The lifting and holding tool of claim 14 , wherein horizontal connection bars included in the lifting and holding tool are arranged and designed such that they form at the same time a lower handle ( 22 ), middle handle ( 23 ) and upper handle ( 24 ).
20 . The lifting and holding tool of claim 14 , wherein a connection hook ( 25 ) of the lifting and holding tool ( 20 ) is partly or mostly recessed and when the lifting and holding tool ( 20 ) is hanged up then the connection hook ( 25 ) extends slanting upwards towards a horizontal under an angle.Join the waitlist — get patent alerts