US2015273576A1PendingUtilityA1

Casting equipment

Assignee: CITIC DICASTAL CO LTDPriority: Mar 27, 2014Filed: Mar 27, 2015Published: Oct 1, 2015
Est. expiryMar 27, 2034(~7.7 yrs left)· nominal 20-yr term from priority
B22D 27/00B22D 18/04B22D 47/00B22D 21/007F27B 3/045B22D 41/005F27D 2099/0013C22B 21/064F27B 2003/125
26
PatentIndex Score
0
Cited by
0
References
0
Claims

Abstract

The present invention relates to an integrated equipment for aluminum alloy refining and casting, in which a holding furnace is divided into two furnace chambers, that is, fluid refining chamber and pressure casting chamber. After being refined in the fluid refining chamber, aluminum fluid doesn't contact air so that it will not be reoxidized, enabling manufacture of casts with fine quality. Meanwhile, immersing electric heating is employed in the holding furnace of the present invention to improve the temperature uniformity of aluminum fluid and the heating efficiency. After completing the pressure casting, the inert gas at high temperature will not be discharged directly into the atmosphere but into a gas tank so that it can be reused after being purified, improving utilization rate of resource and energy.

Claims

exact text as granted — not AI-modified
We claim: 
     
         1 . A casting equipment comprising a low pressure casting machine and a mould, characterized in that the body frame ( 1 ) of the low pressure casting machine is mounted with the mould ( 2 ), and the body frame ( 1 ) of the low pressure casting machine is mounted with a holding furnace ( 4 ) at its lower portion; the holding furnace ( 4 ) is divided into two furnace chambers, that is, fluid refining chamber ( 4 - 1 ) and pressure casting chamber ( 4 - 2 ), the two furnace chambers are connected at their lower portions through a passage with a gate valve ( 13 ) and a filter ( 14 ); the two furnace chambers are each provided with immersing electric heaters ( 12 ) at their lower portions, and the fluid refining chamber ( 4 - 1 ) is provided at its bottom portion with permeable bricks ( 15 ) at regular intervals, which bricks are connected with a compressed inert gas tank via an intake tube ( 9 ) having an electric proportional valve B ( 10 ); the fluid refining chamber ( 4 - 1 ) is provided at its middle-upper portion with a furnace gate ( 16 ); the two furnace chambers are connected at their upper portions through a connecting pipe ( 17 ) having an electric valve ( 18 ); the pressure casting chamber ( 4 - 2 ) is connected at its upper portion with the sprue of the mould ( 2 ) through the lifting tube ( 7 ) and a suction tube ( 3 ), and the lifting tube ( 7 ) is provided at its lower portion with a filtering screen ( 8 ); the pressure casting chamber ( 4 - 2 ) is provided at its upper portion with a pressure relief tube ( 5 ) having an electric proportional valve A ( 6 ), which tube is connected with a gas tank.

Join the waitlist — get patent alerts

Track US2015273576A1 — get alerts on status changes and closely related new filings.

We store only your email — no account needed. See our privacy policy.