US2015129234A1PendingUtilityA1
Offshore drilling unit and method of maintaining stability of the drilling unit in potential ice conditions
Est. expiryNov 12, 2033(~7.3 yrs left)· nominal 20-yr term from priority
E21B 43/00E02B 17/0021E02B 17/08E02B 2017/0056E21B 41/0007E02B 17/02E21B 7/008E21B 7/02B63B 21/502B63B 35/4413B63B 2211/06
45
PatentIndex Score
0
Cited by
0
References
0
Claims
Abstract
An offshore drilling unit includes a main body configured to be bottom supported in shallow water. Also included is an anchoring assembly secured to a sea floor. Further included is a tensioning system operatively coupled to the main body and the anchoring assembly, wherein the tensioning system is configured to apply a downward force on the main body to resist ice loads imposed on the offshore drilling unit.
Claims
exact text as granted — not AI-modifiedWhat is claimed is:
1 . An offshore drilling unit comprising:
a main body; a ballast finable with water to at least partially submerge the unit in a body of water with the unit resting on a sea floor; an anchoring assembly having a pile secured to the sea floor; and a tensioning system operatively coupled to the pile and to the main body at a location above the water, wherein the tensioning system is configured to apply a downward force on the main body to resist ice loads imposed on the offshore drilling unit.
2 . The offshore drilling unit of claim 1 , wherein the tensioning system comprises at least one tension member and a winch configured to adjust tension of the at least one tension member.
3 . The offshore drilling unit of claim 2 , wherein the at least one tension member comprises a wire cable.
4 . The offshore drilling unit of claim 2 , wherein the anchoring assembly comprises a plurality of suction piles at least partially embedded in the sea floor.
5 . The offshore drilling unit of claim 4 , wherein the at least one tension member is directly coupled to the plurality of suction piles.
6 . The offshore drilling unit of claim 1 , wherein the main body comprises an offshore structure permanently installed at a drilling location.
7 . The offshore drilling unit of claim 1 , wherein the main body comprises a mobile offshore drilling unit.
8 . The offshore drilling unit of claim 1 , wherein more than 25 percent of weight for the unit is under the water and spaced from a sea surface toward the sea floor.
9 . A method of maintaining stability of an offshore drilling unit in potential ice conditions, the method comprising:
positioning the offshore drilling unit in a desired location in a body of water; filling ballast with water to at least partially submerge the unit until resting on a sea floor of the body of water; securing an anchoring assembly having a pile to the sea floor; and imposing a downward force on a main body of the offshore drilling unit at a location above the water with a tensioning system operatively coupled to the main body and the pile.
10 . The method of claim 9 , further comprising adjusting the downward force with the tensioning system to provide a desired force configured to withstand loads imparted on the offshore drilling unit by contact between ice and the offshore drilling unit.
11 . The method of claim 9 , wherein the main body is a platform and imposing the downward force on the main body increases the downward force on the platform.
12 . The method of claim 9 , wherein imposing the downward force on the main body with the tensioning system comprises manipulating a winch configured to adjust a tension of a tension member.
13 . The method of claim 9 , wherein securing the anchoring assembly to the sea floor comprises partially embedding a plurality of piles within the sea floor.
14 . The method of claim 13 , wherein securing the anchoring assembly further comprises operatively coupling respective lower ends of a plurality of legs with a plurality of piled sockets operatively coupled to the plurality of piles, wherein the plurality of legs extend downwardly from the main body of the offshore drilling unit.
15 . The method of claim 9 , wherein the method is performed in bodies of water where ice is present.
16 . A method of extracting hydrocarbons from a well in ice prone waters, the method comprising:
positioning an offshore drilling unit having a platform in a desired location in a body of water; filling ballast with water to at least partially submerge the unit until resting on a sea floor; securing to the sea floor an anchoring assembly having a plurality of piles at least partially embedded in the sea floor; imposing a downward force on the platform of the offshore drilling unit with a tension member of a tensioning system, the tension member operatively coupled to the platform and the piles; and extracting hydrocarbons from the well.
17 . The method of claim 16 , further comprising adjusting the downward force imposed on the platform by manipulating the tension member with a winch.Join the waitlist — get patent alerts
Track US2015129234A1 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.