US2014042655A1PendingUtilityA1
Method and apparatus for constructing railway for rubber-wheeled automated guideway transit system
Est. expiryOct 17, 2028(~2.2 yrs left)· nominal 20-yr term from priority
Inventors:Nam Hun Kang
E01B 25/28E01B 29/005E01B 37/00B61B 13/00
34
PatentIndex Score
0
Cited by
0
References
0
Claims
Abstract
A method is provided for constructing railways for a rubber-wheeled AGT system, including: constructing guideways on vertical walls of a light rail vehicle road bed, arranging steel bars at a place where railways will be formed, installing molds around the arranged steel bars; pouring concrete in the molds; and forming, using a pressing unit of a finisher, the railways applied with concrete such that the railways have a same trace as the guideways by moving a finisher along the guideways forming a top surface of the concrete, and curing the concrete.
Claims
exact text as granted — not AI-modified1 . A method for constructing railways for a rubber-wheeled AGT system, comprising:
constructing guideways on vertical walls of a light rail vehicle road bed; arranging steel bars at a place where railways will be formed; installing molds around the arranged steel bars; pouring concrete in the molds; and forming, using a pressing unit of a finisher, the railways applied with concrete such that the railways have a same trace as the guideways by moving a finisher along the guideways forming a top surface of the concrete; and curing the concrete.
2 . The method of claim 1 , further comprising, after arranging the steel bars, installing drain pipes and system pipes.
3 . The method of claim 1 , further comprising, after curing the concrete, line grooves for improving frictional force of the concrete.
4 . The method of claim 1 , further comprising, after arranging the steel bars, pressing the arranged steel bars using the finisher running along the guideways such that the arranged steel bars have a same trace as the guideways.
5 . The method of claim 2 , further comprising, after arranging the steel bars, pressing the arranged steel bars using the finisher running along the guideways such that the arranged steel bars have a same trace as the guideways.
6 . The method of claim 3 , further comprising, after arranging the steel bars, pressing the arranged steel bars using the finisher running along the guideways such that the arranged steel bars have a same trace as the guideways.
7 . The method of claim 4 , further comprising, after arranging the steel bars, pressing the arranged steel bars using the finisher running along the guideways such that the arranged steel bars have a same trace as the guideways.Join the waitlist — get patent alerts