US2013341323A1PendingUtilityA1
Fluid Containment System and Building Method
Individually held — no corporate assignee on recordPriority: Jun 12, 2012Filed: Jun 12, 2013Published: Dec 26, 2013
Est. expiryJun 12, 2032(~5.9 yrs left)· nominal 20-yr term from priority
Inventors:David Hudak
E03F 5/103Y10T29/49826B65D 88/02
38
PatentIndex Score
0
Cited by
0
References
0
Claims
Abstract
Systems and building methods for scalable, sturdy, above-ground containment cells for large quantities of fluid are disclosed. The systems can be built quickly on site and disassembled when a project is finished.
Claims
exact text as granted — not AI-modifiedWhat is claimed is:
1 . An above-ground fluid containment system comprising:
a holding cell structure comprising a floor and one or more walls comprising at least one tier of one or more gabions forming a skeleton; and embankments extending from said floor to said one or more walls.
2 . The fluid containment system of claim 1 wherein said gabions comprise varying geometric shapes.
3 . The fluid containment system of claim 2 wherein at least on said shape of said gabions is triangular.
4 . The fluid containment system of claim 1 wherein said skeleton is anchored to a ground surface.
5 . The fluid containment system of claim 4 wherein said skeleton is anchored through rods nailed into the ground surface and connected to said one or more said gabions.
6 . The fluid containment system of claim 4 wherein said skeleton is anchored to the ground surface through cables.
7 . The fluid containment system of claim 4 wherein said skeleton is anchored to the ground surface through posts driven through an interior of said gabions.
8 . The fluid containment system of claim 7 wherein said posts are driven through an outside of said walls.
9 . The fluid containment system of claim 7 wherein said posts are driven through an inside of said walls.
10 . The fluid containment system of claim 7 wherein said posts suspend cabling for bird netting.
11 . The fluid containment system of claim 1 comprising two or more tiers and said tiers are staggered.
12 . The fluid containment system of claim 1 further comprising piping.
13 . The fluid containment system of claim 12 wherein said piping is installed over said one or more walls.
14 . The fluid containment system of claim 12 wherein said piping passes through said one or more walls.
15 . The fluid containment system of claim 12 wherein said piping is installed in said floor of said holding cell.
16 . The fluid containment system of claim 12 wherein said piping is installed on said floor of said holding cell structure.
17 . The fluid containment system of claim 12 wherein said piping is perforated to inject gases to fluid stored in said system.
18 . The fluid containment system of claim 17 wherein said perforated piping is disposed in various layers of a fluid contained in said system.
19 . The fluid containment system of claim 17 wherein the gases injected into the fluid comprise air from natural wind currents funneled into said perforated piping.
20 . The fluid containment system of claim 1 further comprising one or more liners.
21 . The fluid containment system of claim 1 wherein said floor is sloped to form one or more low sump areas for drainage.
22 . A method of constructing an above-ground fluid containment system comprising:
building a holding cell by layering one or more tiers of gabions and forming a skeleton; and forming a floor and embankments inside the cell.
23 . The method of claim 22 further comprising disposing one or more liners on the floor and embankments of the holding cell.
24 . The method of claim 22 further comprising excavating a thin layer of dirt within the holding cell to form the floor and embankments.
25 . The method of claim 24 further comprising filling the gabions with dirt from the excavated thin layer.
26 . The method of claim 22 further comprising anchoring the skeleton to a ground surface.
27 . The method of claim 22 comprising anchoring the skeleton with metal rods connected to the gabions.
28 . The method of claim 22 further comprising installing piping over or through the walls to move materials in and out of the cell.
29 . The method of claim 28 further comprising installing piping on the floor.
30 . The method of claim 28 further comprising installing piping in the floor.
31 . The method of claim 28 further comprising installing the piping in various layers of a fluid contained in the system.
32 . The method of claim 22 further comprising sloping the floor and forming one or more low sump areas for draining.
33 . The fluid containment system of claim 1 further comprising embankments outside the walls.Join the waitlist — get patent alerts
Track US2013341323A1 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.