US2013289775A1PendingUtilityA1

Air conditioning control system

Assignee: TOSHIBA KKPriority: Feb 26, 2010Filed: Jun 24, 2013Published: Oct 31, 2013
Est. expiryFeb 26, 2030(~3.6 yrs left)· nominal 20-yr term from priority
F24F 11/63F24F 11/58F24F 11/46F24F 11/52F24F 11/54F24F 11/30F24F 11/62F24F 2110/10F24F 11/56G05D 23/19F24F 2110/20F24F 2140/60
55
PatentIndex Score
0
Cited by
0
References
0
Claims

Abstract

According to an embodiment, provided is an air conditioning control system having a remote controller which collectively controls air conditioning facilities respectively provided in multiple buildings through a network. A building monitoring and controlling device is provided in each of the buildings. The building monitoring and controlling device monitors an air conditioning facility in a building where the building monitoring and controlling device itself is installed, and transmits operation data on the air conditioning facility to the remote controller. The remote controller calculates each operation setting value based on each set of operation data, and transmits the calculated operation setting value to the building monitoring and controlling device corresponding to the calculated operation setting value. The building monitoring and controlling device which has received the operation setting value controls the air conditioning facility by transmitting the operation setting value to the air conditioning facility.

Claims

exact text as granted — not AI-modified
1 .- 9 . (canceled) 
     
     
         10 . A building controlling device used for controlling an air conditioning facility and managed by a remote controller, the building controlling device comprising:
 means for receiving operation data on the air conditioning facility periodically from the air conditioning facility;   means for transmitting the received operation data periodically to the remote controller;   means for receiving an operation setting value for the air conditioning facility from the remote controller; and   means for transmitting the received operation setting value to the air conditioning facility;   wherein the remote controller:
 acquires the operation data on the air conditioning facility from the building controlling device, 
 calculates the operation setting value for the air conditioning facility based on the operation data, and 
 transmits the operation setting value periodically to the building controlling device. 
   
     
     
         11 . The building controlling device according to  claim 10 , wherein the operation data includes temperature and humidity. 
     
     
         12 . The building controlling device according to  claim 10 , wherein the operation setting value includes an operation set temperature and an operation set humidity. 
     
     
         13 . A remote controller to manage at least one building controlling device used for controlling an air conditioning facility, the remote controller comprising:
 means for acquiring operation data on an air conditioning facility from the building controlling device;   means for calculating an operation setting value for the air conditioning facility based on the operation data; and   means for transmitting the operation setting value periodically to the building controlling device;   wherein the building controlling device:
 receives the operation data on the air conditioning facility periodically from the air conditioning facility; 
 transmits the received operation data periodically to the remote controller; 
 receives the operation setting value for the air conditioning facility from the remote controller; and 
 transmits the received operation setting value to the air conditioning facility. 
   
     
     
         14 . The remote controller according to  claim 13 , wherein the operation data includes temperature and humidity. 
     
     
         15 . The remote controller according to  claim 14 , wherein the operation setting value includes an operation set temperature and an operation set humidity. 
     
     
         16 . The remote controller according to  claim 13 , wherein the operation data includes temperature, humidity and outdoor temperature, and the means for calculating an operation setting value calculates the operation setting value using a comfort index PMV.

Join the waitlist — get patent alerts

Track US2013289775A1 — get alerts on status changes and closely related new filings.

We store only your email — no account needed. See our privacy policy.