Heating system and method for operating said system
Abstract
The invention relates to a heating system and a method for operating said system, comprising a first and a second heating device ( 1, 2 ) and a common control unit ( 3 ), wherein the first and the second heating device ( 1, 2 ) is designed such that it can be operated with the same fluid fuel and that it can be controlled by means of the control unit ( 3 ). According to the invention, at least one time-dependent process parameter of the control unit ( 3 ) is intended and/or used as a calculation basis for determining fuel consumption values of the first and/or second heating device ( 1, 2 ).
Claims
exact text as granted — not AI-modified1 . A heating system comprising a first and a second heating device ( 1 , 2 ) and a common control unit ( 3 ), wherein the first and second heating device ( 1 , 2 ) are designed so that they can be operated with the same fluid fuel and can be controlled by means of the control unit ( 3 ),
wherein at least one time-dependent process parameter of the control unit ( 3 ) is provided as a calculation basis for determining fuel consumption values of the first and/or second heating device ( 1 , 2 ).
2 . The heating system according to claim 1 ,
wherein one of the two heating devices ( 1 ) is configured as a combined heat and power heating device, in particular as a Stirling engine, for generating heat and power.
3 . The heating system according to claim 1 ,
wherein one of the two heating devices ( 2 ) is configured as a heating boiler for generating heat.
4 . A method for operating a heating system comprising a first and a second heating device ( 1 , 2 ) and a common control unit ( 3 ), wherein the first and second heating device ( 1 , 2 ) are operated with the same fluid fuel and are controlled by means of the control unit ( 3 ),
wherein at least one time-dependent process parameter of the control unit ( 3 ) is provided as a calculation basis for determining fuel consumption values of the first and/or second heating device ( 1 , 2 ).
5 . The method according to claim 4 ,
wherein the process parameter is integrated over the time and the fuel consumption value is determined from this and using a predetermined correlation.
6 . The method according to claim 4 ,
wherein an electrical power generated by a heating device ( 1 ) configured as a combined heat and power heating device is used as a process parameter.
7 . The method according to claim 4 ,
wherein a rotational speed of a burner fan disposed on one of the two heating devices ( 1 , 2 ) is used as a process parameter.
8 . The method according to claim 4 ,
wherein a temperature measured at one of the two heating devices ( 1 , 2 ) is used as a process parameter.Join the waitlist — get patent alerts
Track US2012288805A1 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.