Steam turbine overspeed protection method and system
Abstract
A method and system is disclosed for generating a steam turbine overspeed control system fault alert. The method can include providing an overspeed control system with a control valve configured and located to adjust a speed of the steam turbine, the control valve having a control position. The method can also include monitoring the control position of the control valve and detecting a deloading event. Upon detection of a deloading event, a control system fault alert is generated when the control valve does not achieve a predefined control position within a predefined time from the deloading event.
Claims
exact text as granted — not AI-modified1 . A method for generating a steam turbine overspeed control system fault alert comprising:
providing an overspeed control system with a control valve configured and located to adjust a speed of the steam turbine, the control valve having a control position; monitoring the control position of the control valve; detecting a deloading event; and generating a control system fault alert when the control valve does not achieve a predefined control position within a predefined time from the deloading event.
2 . The method of claim 1 wherein the deloading event is a predefined steam turbine speed.
3 . The method of claim 2 wherein the predefined time is substantially zero.
4 . The method of claim 2 wherein the steam turbine is a component of a power plant with a generator, wherein the detecting a deloading event includes detecting the opening of a power breaker of the power plant.
5 . An overspeed control system for generating a steam turbine overspeed fault alert, comprising:
a control valve configured and located to adjust a speed of the steam turbine, the control valve having a control position; a monitor for monitoring the control position of the control valve; a detector for detecting a deloading event; and a controller for generating a control system fault alert when the control valve does not achieve a predefined control position within a predefined time from the deloading event.
6 . The overspeed control system of claim 4 , wherein the deloading event is a predefined steam turbine speed.
7 . The overspeed control system of claim 4 , wherein the predefined time is zero.
8 . A power plant comprising:
a steam turbine having a generator and a power breaker; and an overspeed control system including:
a control valve configured and located to adjust a speed of the steam turbine, the control valve having a control position;
a monitor for monitoring the control position of the control valve;
a detector for detecting a deloading event; and
a controller for generating a control system fault alert when the control valve does not achieve a predefined control position within a predefined time from the deloading event.
9 . The power plant of claim 8 , wherein the deloading event is a predefined steam turbine speed.
10 . The power plant of claim 8 , wherein the detecting a deloading event includes detecting the opening of the power breaker of the power plant
11 . The power plant of claim 8 , wherein the predefined time is substantially zero.Join the waitlist — get patent alerts
Track US2012151922A1 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.