Building
Abstract
The building of the present invention includes a wall making a boundary of a room, an inner wall formed by a group including first and second tubular structures and arranged on the wall as one body, and an air conditioner arranged in the room. The first tubular structure has a first ventilation hole, where gas blown into the first tubular structure from the air conditioner and passed through the first tubular structure with substantially no leakage is blown out, at a to-be-arranged position of a first storage equipment which is to be arranged in the room. The second tubular structure has a second ventilation hole, where the gas blown into the second tubular structure from the air conditioner and passed through the second tubular structure with substantially no leakage is blown out, at a to-be-arranged position of a second storage equipment which is to be arranged in the room.
Claims
exact text as granted — not AI-modified1 . A building comprising;
a wall making a boundary of a room; an inner wall formed by a group including a first tubular structure and a second tubular structure and arranged on the wall as one body; and an air conditioner arranged in the room; wherein the first tubular structure has a first ventilation hole, where gas blown into the first tubular structure from the air conditioner and passed through the first tubular structure with substantially no leakage is blown out, at a to-be-arranged position of a first storage equipment which is to be arranged in the room, and wherein the second tubular structure has a second ventilation hole, where the gas blown into the second tubular structure from the air conditioner and passed through the second tubular structure with substantially no leakage is blown out, at a to-be-arranged position of a second storage equipment which is to be arranged in the room.
2 . The building according to claim 1 ,
wherein the group for the inner wall further includes a third tubular structure and a fourth tubular structure, the third tubular structure has a third ventilation hole at a to-be-arranged position of the first storage equipment, the fourth tubular structure is arranged outside the to-be-arranged position of the first storage equipment. and the gas blown into the fourth tubular structure from the air conditioner is blown out from the third ventilation hole, with substantially no leakage.
3 . The building according to claim 1 ,
wherein the first tubular structure and the second tubular structure are arranged to be stacked, the first tubular structure has a fourth ventilation hole formed at a to-be-arranged position of the second storage equipment and a sealing material sealing a space between the first ventilation hole and the fourth ventilation hole, and the gas blown into the second tubular structure from the air conditioner is blown out from the fourth ventilation hole through the second ventilation hole, with substantially no leakage.
4 . The building according to any one of claim 1 to claim 3 , wherein the air conditioner is used for cooling or heating of the room.
5 . The building according to claim 4 , wherein the inner wall is arranged on a floor part of the wall.
6 . The building according to claim 5 , wherein the first tubular structure and the second tubular structure are formed by using a plurality of floor rails.
7 . The building according to claim 6 , wherein the building is any one of a ship, aircraft, a train, a warehouse, a container and a loading space of motor vehicle.Join the waitlist — get patent alerts
Track US2012131869A1 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.