US2011297395A1PendingUtilityA1

Remote drilling and completions management

Assignee: CODESAL PABLO ARIELPriority: Dec 30, 2009Filed: Dec 9, 2010Published: Dec 8, 2011
Est. expiryDec 30, 2029(~3.4 yrs left)· nominal 20-yr term from priority
E21B 44/00
23
PatentIndex Score
0
Cited by
0
References
0
Claims

Abstract

A methodology reduces the needed number of personnel on a rig by enabling performance of a variety of functions from a remote location. The method comprises utilizing a plurality of observation devices which monitor rig parameters remotely. Data from the observation devices is transmitted to a remote operations center used to analyze the data for determining operational changes to the rig. Control instructions may then be transmitted to the rig to implement the operational changes.

Claims

exact text as granted — not AI-modified
1 . A method for constructing a well, comprising:
 obtaining real-time digital measurements of parameters on a rig;   automatically transmitting the real-time digital measurements to a remote operations center;   processing the real-time digital measurements at the remote operations center to determine rig operational changes;   transmitting data on the rigged operational changes back to the rig; and   implementing the rig operational changes.   
     
     
         2 . The method as recited in  claim 1 , wherein obtaining comprises utilizing sensors mounted on the rig. 
     
     
         3 . The method as recited in  claim 1 , wherein obtaining comprises utilizing cameras located on the rig. 
     
     
         4 . The method as recited in  claim 1 , wherein obtaining comprises utilizing microphones located on the rig. 
     
     
         5 . The method as recited in  claim 1 , wherein implementing comprises automatically adjusting a rotary steerable system via a downlink-to-rotary steerable system. 
     
     
         6 . The method as recited in  claim 1 , wherein implementing comprises automatically adjusting the operation of a mud pump. 
     
     
         7 . The method as recited in  claim 1 , wherein implementing comprises automatically adjusting the weight on a drill bit. 
     
     
         8 . The method as recited in  claim 1 , wherein implementing comprises automatically adjusting a block position on the rig. 
     
     
         9 . The method as recited in  claim 1 , wherein implementing comprises automatically adjusting the RPM of a drilling system. 
     
     
         10 . The method as recited in  claim 1 , wherein implementing comprises automatically adjusting a toolface position of a downhole motor. 
     
     
         11 . The method as recited in  claim 1 , wherein implementing comprises automatically adjusting a toolface position of a downhole turbine. 
     
     
         12 . The method as recited in  claim 1 , wherein implementing comprises automatically adjusting fluid properties of a mud fluid. 
     
     
         13 . A method for constructing a well, comprising:
 monitoring rig parameters via a plurality of different types of observation devices;   sending data on the rig parameters to a processing system at a remote operations center;   processing and analyzing the data at the remote operations center; and   controlling rig operational changes from the remote operations center based on results obtained from processing and analyzing the data.   
     
     
         14 . The method as recited in  claim 13 , wherein monitoring comprises obtaining real-time digital measurements. 
     
     
         15 . The method as recited in  claim 14 , wherein sending comprises automatically sending real-time digital measurement data to the remote operations center. 
     
     
         16 . The method as recited in  claim 13 , wherein processing and analyzing comprises processing and analyzing the data on a computer-based processing system and outputting results to a graphical user interface. 
     
     
         17 . The method as recited in  claim 16 , wherein controlling comprises utilizing the computer-based processing system and the remote operations center to automatically control the rig operational changes. 
     
     
         18 . A method for efficient well construction, comprising:
 reducing the number of personnel on a rig;   utilizing a plurality of observation devices to monitor rig parameters remotely;   making decisions regarding operational changes to the rig at a remote operations center; and   implementing the operational changes from the remote operations center.   
     
     
         19 . The method as recited in  claim 18 , wherein making decisions comprises processing data from the observation devices on a computer-based processing system located at the remote operations center. 
     
     
         20 . The method as recited in  claim 18 , wherein implementing comprises automatically changing a plurality of functions on the rig.

Join the waitlist — get patent alerts

Track US2011297395A1 — get alerts on status changes and closely related new filings.

We store only your email — no account needed. See our privacy policy.