A prefabricated steel bridge or viaduct structure, which is formed essentially of three blocks fabricated and pre-assembled in factory, and assembled together to the construction site. Once the blocks mounted thereon the concrete pillars, a surface drain for evacuating water is installed thereof to be casted therein a concrete slab and after covered from asphalt with drip slope.
Claims
exact text as granted — not AI-modified1 . A steel bridge or viaduct structure which is formed essentially of three blocks fabricated and pre-assembled in factory, and assembled together to the construction site by means of joints and bolts, wherein each block includes diaphragms assembled to angle iron welded to beams sliding on pieces fixed thereon the concrete pillars, wherein the beams are welded to parapet assembled to guardrail, and once the blocks mounted thereon the concrete pillars a surface drain for evacuating water is installed thereof to be casted therein a concrete slab and after covered from asphalt with drip slope.
Join the waitlist — get patent alerts
Track US2011225746A1 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.