Member for temporarily restoring road surface and method for temporarily restoring road surface
Abstract
There is provided a temporary restoration member (lining mats ( 1 ), nonslip pins ( 2 ), lock pins ( 3 ), stoppers ( 4 ), fixing pins ( 5 )) for simplifying the construction work for temporarily restoring a road surface when a paved road surface (B) is excavated to lay piping, and a method for restoring the road surface using the member. Each of the lining mats ( 1 ) is a rectangular rubber plate provided with a thick central part ( 11 ), two thin side parts ( 12 ), and pinholes ( 16 ) at appropriate locations that pass through the mats from the front surface to the reverse surface. The lining mats are laid out to cover a backfilled surface so that the side edges of the mats are disposed on the paved road surface (B). Cylindrical nonslip pins ( 2 ) are driven into the pinholes, and lock pins ( 3 ) are driven into the cylindrical part of the nonslip pins to fix the lining mats. Latching protrusions ( 42 ) of stoppers ( 4 ) are inserted into the pinholes to connect adjoining mats.
Claims
exact text as granted — not AI-modified1 . A member for temporarily restoring a road surface, comprising:
a lining mat formed from a rectangular rubber plate, triangular rubber plate, or other polygonal rubber plate having appropriate rigidity; the lining mat being provided with a thick central part in which a central portion corresponding to an excavation shape of the road surface is thickly formed, thin side parts wherein predetermined sides of the thick central part are thinly formed so that the reverse surface is hollowed out in steps, and pinholes that pass completely through the mat from a front surface to a reverse surface at appropriate sites on the thick central part near the corners.
2 . The member for temporarily restoring a road surface according to claim 1 , wherein thin side parts are provided to the four peripheral edges of the rectangular lining mat.
3 . The member for temporarily restoring a road surface according to claim 1 , wherein thin side parts are provided to a base side edge and apex portion in the triangular lining mat.
4 . The member for temporarily restoring a road surface according to claim 1 or 3 , wherein thin side parts are provided to appropriate peripheral edges of the lining mat, and a linking protrusion that corresponds to the shape of an empty space underneath the thin side parts is provided to the peripheral edge on which no thin side part is formed.
5 . The member for temporarily restoring a road surface according to claim 1 or 3 , wherein a coupling protrusion made to protrude from a lower portion of each of the lining mats is provided to an end edge on one side of the thick central part of the lining mat in the direction traversing the channel, and a coupling depression that corresponds to the coupling protrusion is provided to the other side.
6 . The member for temporarily restoring a road surface according to claim 1 or 2 , wherein the entire member has a long rectangular shape, and a plurality of shallow depressions that are oriented parallel to a lengthwise side edge are provided to the bottom surface of the thick central part.
7 . The member for temporarily restoring a road surface according to claim 1 , wherein a reinforcing metal mesh member is installed in the interior.
8 . The member for temporarily restoring a road surface according to claim 1 , having a two-layer structure in which a hard rubber material is formed on the front surface and a slightly soft rubber material is formed on the reverse surface.
9 . The member for temporarily restoring a road surface according to claim 1 , wherein small prongs, very small protrusions, fine channels, or the like are formed on the front surface to impart a nonslip function.
10 . A member for temporarily restoring a road surface comprising:
a lining mat formed from a rectangular rubber plate, triangular rubber plate, or other polygonal rubber plate having appropriate rigidity, the lining mat being provided with a thick central part in which a central portion corresponding to an excavation shape of the road surface is thickly formed, thin side parts wherein predetermined sides of the thick central part are thinly formed so that the reverse surface is hollowed out in steps, and pinholes that pass completely through the mat from a front surface to a reverse surface at appropriate sites on the thick central part near the corners; a cylindrical nonslip pin for inserting into the pinholes in the lining mat, and having a length such that an appropriate length protrudes from a bottom surface of the thick central part of the lining mat when the nonslip pin is inserted; and a lock pin for inserting into the cylindrical part of the nonslip pin, and having a length such that an appropriate length protrudes from under the nonslip pin when the lock pin is inserted.
11 . The member for temporarily restoring a road surface according to claim 10 , wherein an upper part of the pinholes and a shape of a head part of both pins are formed so that the head parts of the nonslip pin and the lock pin do not protrude from the top surface of the lining mat when a predetermined insertion is made; and are formed at a size imparting sufficient planar surface area to receive the weight of vehicles running on the road surface.
12 . A member for temporarily restoring a road surface, comprising:
a lining mat formed from a rectangular rubber plate, triangular rubber plate, or other polygonal rubber plate having appropriate rigidity, the lining mat being provided with a thick central part in which a central portion corresponding to an excavation shape of the road surface is thickly formed, thin side parts in which predetermined sides of the thick central part are thinly formed so that the reverse surface is hollowed out in steps, and pinholes that pass completely through the mat from a front surface to a reverse surface at appropriate sites on the thick central part near the corners; a stopper provided with a latching protrusion that protrudes from the top of an appropriately shaped base plate and is installed in the pinholes of the lining mat, and provided with a through hole at an appropriate site; and a fixing pin that can be driven through the through hole.
13 . A member for temporarily restoring a road surface, comprising:
a lining mat formed from a rectangular rubber plate, triangular rubber plate, or other polygonal rubber plate having appropriate rigidity, the lining mat being provided with a thick central part in which a central portion corresponding to an excavation shape of the road surface is thickly formed, thin side parts in which predetermined sides of the thick central part are thinly formed so that the reverse surface is hollowed out in steps, and pinholes that pass completely through the mat from a front surface to a reverse surface at appropriate sites on the thick central part near the corners; and a stopper provided with a latching protrusion that protrudes from the top of an appropriately shaped base plate and is installed in the pinholes of adjoining lining mats when predetermined adjoining lining mats are linked consecutively at end edge portions.
14 . The member for temporarily restoring a road surface according to claim 13 , comprising:
a stopper provided with a base plate jutting out from a side of a line of latching protrusions, and provided with a through hole in the jutting surface; and a fixing pin that can be driven through the through hole.
15 . A member for use in construction work for temporarily restoring a road surface, comprising a plurality of ruler plates formed in shapes corresponding to an excavation width of a road surface, and corresponding to the shape of the thick central part in the lining mats of claim 1 that have a variety of dimensions and shapes.
16 . A method for temporarily restoring a road surface in which a paved road surface is excavated to perform predetermined construction work, and the excavation site is temporarily restored,
the method for temporarily restoring a road surface characterized in that: the excavation site is backfilled nearly to the height of the road surface; a lining mat formed from a rectangular rubber plate having appropriate rigidity, and provided with a thick central part in which a thick central portion corresponding to an excavation shape of the road surface is thickly formed, thin side parts in which predetermined sides of the thick central part are thinly formed so that the reverse surface is hollowed out in steps, and pinholes that pass completely through the mat from a front surface to a reverse surface at appropriate sites on the thick central part near the four corners, is then laid out so as to cover the backfilled surface so that the ends of the thin side parts are positioned on the paved road surface; and a cylindrical nonslip pin is driven through the pinholes and into the backfilled ground so that a bottom part of the pin protrudes by appropriate amount from the bottom surface of the lining mat, and a lock pin is driven through the cylindrical part of the nonslip pin and into the backfilled ground so that a bottom part of the pin protrudes by an appropriate amount from the bottom end of the nonslip pin to fix the lining mat.
17 . The method for temporarily restoring a road surface according to claim 16 , wherein when the lining mats have been laid out so as to cover the backfilled surface so that the ends of the thin side parts are positioned on the paved road surface, and in a case where the thin side parts are positioned on the backfilled surface, lining mats having a linking protrusion that corresponds to the shape of the empty space underneath the thin side parts and is provided to the peripheral edge on which no thin side part is formed are disposed next to each other to cover the backfilled surface, and the coupling linking protrusion of one of the adjoining lining mats is inserted underneath the thin side part of another adjoining lining mat to connect the adjoining lining mats.
18 . The method for temporarily restoring a road surface according to claim 16 , wherein:
a long lining mat is laid out on top of the backfilled surface of the channel-shaped excavation site, said long lining mat including the lining mats, each provided with a coupling depression and a coupling protrusion at either end and coupled to form a line; a stopper provided with a line of latching protrusions protruding from the top of a base plate at a predetermined spacing is disposed on the lower surface of the adjoining lining mats; and the latching protrusions of the stopper are installed in the pinholes of the adjoining lining mats to connect the adjoining lining mats.
19 . The method for temporarily restoring a road surface according to claim 16 , wherein:
before the road surface is excavated, a plurality of ruler plates formed in shapes corresponding to the shape of the thick central part of the lining mats are laid out in a configuration matching the shape of the excavation channel; the paved surface of the road is cut into and channel excavation is performed following the ruler plates; and lining mats that correspond to the ruler plates are used.
20 . A method for temporarily restoring a road surface in which a paved road surface is excavated to perform predetermined construction work, and the excavation site is temporarily restored, the method for temporarily restoring a road surface characterized in that:
the excavation site is backfilled nearly to the height of the road surface; a lining mat formed from a rectangular rubber plate having appropriate rigidity, and provided with a thick central part in which a thick central portion corresponding to an excavation shape of the road surface is thickly formed, thin side parts in which predetermined sides of the thick central part are thinly formed so that the reverse surface is hollowed out in steps, and pinholes that pass completely through the mat from a front surface to a reverse surface at appropriate sites on the thick central part near the four corners, is then laid out so as to cover the backfilled surface so that the ends of the thin side parts are positioned on the paved road surface; a stopper provided with latching protrusions that protrude from the top of an appropriately shaped base plate and are installed in the pinholes of the lining mats, and provided with a through hole at an appropriate site, is disposed on the lower surface of the lining mat; the latching protrusions are installed in the pinholes; and a fixing pin is driven via the through hole of the stopper that is positioned protruding from the excavation ground surface outside the backfill area from which only the paved surface has been removed, and into the ground to fix the lining mat.
21 . The method for temporarily restoring a road surface according to claim 20 , wherein when the lining mats have been laid out so as to cover the backfilled surface so that the ends of the thin side parts are positioned on the paved road surface, in a case where a thin side part is positioned on the backfilled surface, lining mats having a linking protrusion that corresponds to the shape of an empty space underneath the thin side part provided to the peripheral edge on which no thin side part is formed are disposed next to each other to cover the backfilled surface, and the linking protrusion of one of the adjoining lining mats is inserted underneath the thin side part of another adjoining lining mat to connect the adjoining lining mats.
22 . The method for temporarily restoring a road surface according to claim 20 , wherein:
a long lining mat is laid out on top of the backfilled surface of the channel-shaped excavation site, said long lining mat including the lining mats, each provided with a coupling depression and a coupling protrusion at either end and coupled to form a line; a stopper provided with a line of latching protrusions protruding from the top surface of a base plate at a predetermined spacing is disposed on the lower surface of the adjoining lining mats; and the latching protrusions of the stopper are installed in the pinholes of the adjoining lining mat to connect adjoining lining mats.
23 . The method for temporarily restoring a road surface according to claim 20 , wherein:
before the road surface is excavated, a plurality of ruler plates formed in shapes corresponding to the shape of the thick central part of the lining mats are laid out in a configuration matching the shape of the excavation channel; the paved surface of the road is cut into and channel excavation is performed following the ruler plates; and lining mats that correspond to the ruler plates are used.Join the waitlist — get patent alerts