US2011135397A1PendingUtilityA1
External turret with above water connection point
Est. expiryOct 9, 2029(~3.2 yrs left)· nominal 20-yr term from priority
Inventors:Jacob De Baan
E21B 19/004
38
PatentIndex Score
0
Cited by
0
References
0
Claims
Abstract
The present invention provides apparatuses for an offshore connection between a floating vessel and seabed pipelines.
Claims
exact text as granted — not AI-modified1 . An above water connection point between a floating vessel and seabed pipelines comprising
a pipeline manifold for receiving a riser connecting to the vessel; a structure for supporting the pipeline manifold; wherein the pipeline manifold is located on top of the structure and raised above water level and in communication with seabed pipelines.
2 . An above water connection point according to claim 1 wherein the structure is fixed on the seabed floor.
3 . An above water connection point according to claim 1 wherein the pipeline manifold can be positioned at any required distance from the structure.
4 . An above water connection point according to claim 1 wherein the pipeline manifold can be positioned at any required distance from the structure to allow a connected riser to move freely in high waves.
5 . An above water connection point according to claim 1 wherein the pipeline manifold includes valves and pig receivers.
6 . An above water connection point according to claim 1 wherein the top of the structure is for mounting a platform .
7 . An above water connection point according to claim 1 wherein the platform can be temporarily locked on top of the structure.
8 . An above water connection point according to claim 1 wherein the structure includes an enclosure for protecting the pipeline manifold and other related apparatus from waves.
9 . A mooring system of a floating vessel to be connected to an above water connection point comprising
an external turret which is extended and raised to a location that distances the hull and outrigger of the vessel from said above water connection point to allow free movement of the vessel around said connection point.
10 . A mooring system according to claim 9 wherein the external turret is extended and raised by extending and elevating the outrigger.
11 . A mooring system according to claim 9 wherein the outrigger is mounted with a crane for hoisting a platform onto the above water connection point.
12 . A mooring system of a floating vessel to be connected to an above water connection point comprising
an external turret which is extended and raised to a location that distances the hull and outrigger of the vessel from said above water connection point to allow free movement of the vessel around said connection point; wherein said above water connection point comprises a pipeline manifold for receiving a riser connecting to the vessel and a structure for supporting the pipeline manifold; and said pipeline manifold is located on top of the structure and raised above water level and in communication with seabed pipelines.
13 . An above water connection point according to claim 12 wherein the structure is fixed on the seabed floor.
14 . An above water connection point according to claim 12 wherein the pipeline manifold can be positioned at any required distance from the structure.
15 . An above water connection point according to claim 12 wherein the pipeline manifold can be positioned at any required distance from the structure to allow a connected riser to move freely in high waves.
16 . An above water connection point according to claim 12 wherein the pipeline manifold includes valves and pig receivers.
17 . An above water connection point according to claim 12 wherein the top of the structure is for mounting a platform .
18 . An above water connection point according to claim 12 wherein the platform can be temporarily locked on top of the structure.
19 . An above water connection point according to claim 12 wherein the structure includes an enclosure for protecting the pipeline manifold and other related apparatus from waves.
20 . A mooring system according to claim 12 wherein the external turret is extended and raised by extending and elevating the outrigger.
21 . A mooring system according to claim 12 wherein the outrigger is mounted with a crane for hoisting a platform onto the above water connection point.Join the waitlist — get patent alerts
Track US2011135397A1 — get alerts on status changes and closely related new filings.