US2011056955A1PendingUtilityA1
Insulation structure of lng carrier cargo tank and method for constructing the same
Est. expiryJun 19, 2028(~1.9 yrs left)· nominal 20-yr term from priority
Inventors:Ki-Hun JohSang-Eon ChunChang-Seon BangDai Gil LeeByung-Chul KimBu Gi KimJin-Gyu KimSoon-Ho YoonSang Wook ParkKwan Ho LeeByoung-Jung KimPo Chul KimHa Na Yu
F17C 2270/0107F17C 2203/0643F17C 2203/035B63B 25/16F17C 2260/033F17C 2270/0105F17C 2203/0663Y10T156/10F17C 2270/0168F17C 2221/033F17C 2203/0358F17C 2203/0646F17C 3/027F17C 2209/227F17C 2223/033F17C 2223/0161F17C 1/12B65D 90/06F17C 1/00
51
PatentIndex Score
0
Cited by
0
References
0
Claims
Abstract
An insulation structure of a cargo tank in an LNG carrier and a method of constructing the insulation structure includes a first metal foil attached and installed in between the top insulation panel and the bottom insulation panel, a second metal foil attached to and installed on the first metal foil that is positioned on an upper side of a gap formed between the bottom insulation panels, and a top bridge panel attached to and installed on an upper side of the second metal foil.
Claims
exact text as granted — not AI-modified1 . An insulation structure of a cargo tank of an LNG carrier having a secondary barrier of a top insulation panel and bottom insulation panels, comprising:
a first metal foil attached and installed in between the top insulation panel and the bottom insulation panels; a second metal foil attached to and installed on the first metal foil at an upper side of a gap formed between the bottom insulation panels; and a top bridge panel attached to and installed on an upper side of the second metal foil.
2 . The insulation structure of claim 1 , wherein the first metal foil and the second metal foil are made of aluminum or stainless steel and are coated with a primer or silane.
3 . The insulation structure of claim 1 , further comprising a protective films installed on adhesion parts formed on the first metal foil and the second metal foil and preventing a foreign substance from being attached.
4 . The insulation structure of claim 1 , wherein adhesive members are pre-coated on adhesion parts formed on the first metal foil and the second metal foil, and the insulation structure further comprises protective films installed on the adhesive members and preventing a foreign substance from being attached.
5 . The insulation structure of claim 4 , wherein the adhesive members comprises filler particles.
6 . The insulation structure of claim 4 , wherein the adhesive members comprise an adhesive film in which an adhesive is coated on a surface of a synthetic resin film.
7 . The insulation structure of claim 4 , wherein the adhesive members comprise a prepreg.
8 . The insulation structure of claim 1 , wherein the second metal foil has a flat shape or a shape with an arc-shaped protruded groove in a middle area, the groove protruded downward along a lengthwise direction of the gap.
9 . A method of constructing an insulation structure of a cargo tank of an LNG carrier having a secondary barrier of a top insulation panel and bottom insulation panels comprising first metal foils attached and installed in between the top insulation panel and the bottom insulation panels, a second metal foil attached to and installed on the first metal foil at an upper side of a gap formed between the bottom insulation panels, and a top bridge panel attached to and installed on an upper side of the second metal foil,
the method comprising:
attaching an adhesive film to a lower face of the second metal foil;
receiving the second metal foil at an adhesion location where the gap is covered in such a way that two opposite sides of the lower face of the second metal foil are respectively in contact with an adjacent pair of the first metal foils;
installing an adhesive jig on an upper face of the second metal foil; and
attaching the second metal foil to the first metals foil by heating and pressing the second metal foil with the adhesive jig.
10 . The method of claim 9 , further comprising, prior to the attaching of the adhesive film, surface-treating a surface of the second metal foil.
11 . The method of claim 10 , wherein the surface-treating is sand blasting or etching.
12 . The method of claim 10 , further comprising, between the surface-treating of the surface of the second metal foil and the attaching of the adhesive film, coating a primer or silane on the surface of the second metal foil.
13 . The method of claim 9 , wherein the adhesive jig comprises:
pressing member configured to press the second metal foil downward; and a heating pad installed in a lower part of the pressing member.
14 . The method of claim 13 , wherein the pressing member includes an air bag.
15 . The method of claim 13 , wherein the heating pad comprises a plane heater.
16 . The method of claim 9 , wherein a width by which the first metal foils and the second metal foil make contact is between 70 mm and 90 mm.
17 . The method of claim 9 , wherein the second metal foil is pressed to between 50 mbar and 350 mbar and heated to between 110° C. and 140° C. for 1 hour and 30 minutes to 2 hours by the adhesive jig.
18 . The method of claim 17 , wherein the second metal foil is pressed to 300±1 mbar and heated to 130±1° C. by the adhesive jig.
19 . The method of claim 15 , wherein a width and a length of the heating pad are respectively greater than those of the second metal foil.
20 . The method of claim 19 , wherein the width and the length of the heating pad are greater than those of the second metal foil by 100 mm and 400 mm or more, respectively.Join the waitlist — get patent alerts