Hazardous drywall remediation method and system
Abstract
The present invention fulfills the above and other objects by providing a method and system for hazardous drywall remediation ( 1 ). The main stages of the hazardous drywall remediation method and system include conducting pre-remediation ( 2 ) of a structure, conducting remediation ( 3 ) of the structure and conducting post-mediation ( 4 ) of the structure. During pre-remediation of a structure the existence or non-existence of hazardous drywall in a structure is confirmed and documented in a written pre-remediation report ( 8 ). Next, during remediation of the structure all hazardous drywall, contaminated building materials, hazardous gasses and hazardous residues are removed from the structure. Finally, during post-mediation of the structure the non-existence of hazardous drywall in the structure is confirmed and documented in a written post-remediation report ( 29 ), which is then may be recorded in the public records ( 30 ).
Claims
exact text as granted — not AI-modified1 . A method for remediating a structure having hazardous drywall located therein, said method comprising the steps of:
a. performing pre-remediation of the structure; b. performing remediation of the structure; and c. performing post-remediation of the structure.
2 . The method of claim 1 wherein step a further comprises the steps of:
physically examining the structure for visual signs of hazardous drywall; physically examining the structure for visual signs of contaminated building materials; and physically examining the structure for the presence of noxious odors.
3 . The method of claim 2 further comprising the step of:
taking photo documentation of contaminated building materials.
4 . The method of claim 2 further comprising the step of:
preparing a written pre-remediation report.
5 . The method of claim 1 wherein step b further comprises the steps of:
removing all drywall from the structure; removing all contaminated building materials from the structure; disposing of the drywall and contaminated building materials; and vacuuming the structure at least one time.
6 . The method of claim 5 further comprising the step of:
obtaining necessary permits for remediating the structure.
7 . The method of claim 5 further comprising the step of:
disconnecting power to the structure; and disconnecting water to the structure.
8 . The method of claim 5 further comprising the step of:
collecting samples of contaminated building materials.
9 . The method of claim 5 further comprising the step of:
collecting samples of drywall.
10 . The method of claim 5 further comprising the step of:
taking photos of labels located on drywall.
11 . The method of claim 5 further comprising the step of
repairing any damaged interior framing found in the structure; and replacing any damaged interior framing found in the structure.
12 . The method of claim 5 further comprising the step of:
cleaning interior surfaces of the structure with a detergent.
13 . The method of claim 5 further comprising the step of:
filtering air in the structure.
14 . The method of claim 5 further comprising the step of:
de-humidifying the structure.
15 . The method of claim 5 further comprising the step of
ventilating the structure.
16 . The method of claim 1 wherein step c further comprises the steps of:
physically examining the structure for visual signs of hazardous drywall; physically examining the structure for visual signs of contaminated building materials; and physically examining the structure for the presence of noxious odors.
17 . The method of claim 16 further comprising the step of:
preparing a written post-remediation report.
18 . The method of claim 17 further comprising the step of:
recording the written post-remediation report in public records.
19 . A system for remediating a structure having hazardous drywall located therein, said method comprising the elements of:
performing pre-remediation of the structure; performing remediation of the structure; and performing post-remediation of the structure.
20 . The system of claim 19 wherein pre-remediation further comprises:
physically examining the structure for visual signs of hazardous drywall; physically examining the structure for visual signs of contaminated building materials; and physically examining the structure for the presence of noxious odors.
21 . The system of claim 20 wherein pre-remediation further comprises:
taking photo documentation of contaminated building materials.
22 . The system of claim 20 wherein pre-remediation further comprises:
preparing a written pre-remediation report.
23 . The system of claim 19 wherein remediation further comprises:
removing all drywall from the structure; removing all contaminated building materials from the structure; disposing of the drywall and contaminated building materials; and vacuuming the structure at least one time.
24 . The system of claim 23 wherein remediation further comprises:
obtaining necessary permits for remediating the structure.
25 . The system of claim 23 wherein remediation further comprises:
disconnecting power to the structure; and disconnecting water to the structure.
26 . The system of claim 23 wherein remediation further comprises:
collecting samples of contaminated building materials.
27 . The system of claim 23 wherein remediation further comprises:
collecting samples of drywall.
28 . The system of claim 23 wherein remediation further comprises:
taking photos of labels located on drywall.
29 . The system of claim 23 wherein remediation further comprises:
repairing any damaged interior framing found in the structure; and replacing any damaged interior framing found in the structure.
30 . The system of claim 23 wherein remediation further comprises:
cleaning interior surfaces of the structure with a detergent.
31 . The system of claim 23 wherein remediation further comprises:
filtering air in the structure.
32 . The system of claim 23 wherein remediation further comprises:
de-humidifying the structure.
33 . The system of claim 23 wherein remediation further comprises:
ventilating the structure.
34 . The system of claim 19 wherein post-remediation further comprises:
physically examining the structure for visual signs of hazardous drywall; physically examining the structure for visual signs of contaminated building materials; and physically examining the structure for the presence of noxious odors.
35 . The system of claim 34 wherein post-remediation further comprises:
preparing a written post-remediation report.
36 . The system of claim 34 wherein post-remediation further comprises:
recording the written post-remediation report in public records.Join the waitlist — get patent alerts