Method of manufacturing heat sink for memory module
Abstract
A method of manufacturing a heat sink for a memory module is provided to remarkably improve its productivity by treating a plurality of heat sinks, which are arranged at a pre-determined interval, as a single body in detaching, painting and adhesive pad adhering steps to reduce a manufacturing cost, and improve its merchantability by interrupting direct contact between the heat sinks to prevent scratch of the heat sinks. The method of manufacturing a heat sink for a memory module comprises cutting and detaching the heat sink from a metal plate coil by using a press device. The heat sinks are connected to a heat sink molded sheet at a pre-determined interval through a bridge, and are detached from the heat sink molded sheet by the press device. After the cutting and detaching steps, the heat sink molded sheet ( 10 ) is painted, an adhesive pad ( 5 ) is adhered to the painted heat sink molded sheet ( 10 ), and the heat sink is separated by cutting the bridge ( 12 ).
Claims
exact text as granted — not AI-modified1 . A method of manufacturing a heat sink for a memory module, the method comprising cutting and detaching the heat sink from a metal plate coil by using a press device,
in which the heat sinks 11 are connected to a heat sink molded sheet 10 at a pre-determined interval through a bridge 12 , and are detached from the heat sink molded sheet 10 by the press device.
2 . The method as claimed in claim 1 , further comprising
painting the heat sink molded sheet 10 after the cutting and detaching steps; adhering an adhesive pad 5 to the painted heat sink molded sheet 10 ; and separating the heat sink by cutting the bridge 12 .
3 . The method as claimed in claim 1 , wherein the bridge 12 of the heat sink molded sheet 10 consists of first bridges 12 a connected to left and right ends of the heat sink 11 , and second bridges 12 b connected to the first bridges 12 a to maintain an arranging interval of the heat sinks 11 .
4 . The method as claimed in claim 1 , wherein in the cutting and detaching steps, a cut line 12 c is formed on each front end of the first bridges 12 a , and through-holes 12 d are formed on the second bridge 12 b at a predetermined pitch.Join the waitlist — get patent alerts
Track US2009241340A1 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.