Method and system for helicopter portable drilling
Abstract
There is provided a system for helicopter portable drilling comprising: a drill frame, a drill mast affixed a first end of the drill frame, a drill operatively coupled to the drill mast and operable using one of compressed air, pressurized hydraulic fluid and both compressed air and pressurized hydraulic fluid and a unified power source for providing compressed air and pressurized hydraulic fluid coupled to the drill, the total operating weight of the system being approximately 3000 pounds for allowing a single-pick move by a helicopter. A method of seismic line drilling comprising the steps of placing a first single-pick drilling system at a first location with a single pick, placing a second single-pick drilling system at a second location with a single pick, when finished drilling, moving the first single-pick drilling system to a third location with a single pick, when finished drilling, moving the second single-pick drilling system to a fourth location with a single pick.
Claims
exact text as granted — not AI-modified1 . A system for helicopter portable drilling comprising:
a drill frame; a drill mast affixed a first end of the drill frame; a drill operatively coupled to the drill mast and operable using one of compressed air, pressurized hydraulic fluid and both compressed air and pressurized hydraulic fluid; and a unified power source for providing compressed air and pressurized hydraulic fluid coupled to the drill; the total operating weight of the system being approximately 3000 pounds for allowing a single-pick move by a helicopter.
2 . The system of claim 1 wherein the unified power source includes a gas turbine.
3 . The system of claim 2 wherein the unified power source includes a first reduction gear coupled to the gas turbine.
4 . The system of claim 3 wherein the unified power source includes a second reduction gear coupled to the first reduction gear.
5 . The system of claim 4 wherein the unified power source includes a hydraulic pump coupled to the second reduction gear.
6 . The system of claim 5 wherein the unified power source includes air compressor coupled to the second reduction gear.
7 . A system for helicopter portable drilling comprising:
a drill including a drill frame;
a drill mast affixed a first end of the drill frame,
a drill operatively coupled to the drill mast and operable using one of compressed air, pressurized hydraulic fluid and both compressed air and pressurized hydraulic fluid, and
a unified power source for providing compressed air and pressurized hydraulic fluid coupled to the drill; and
a drill carrier; the total operating weight of each of the drill and the drill carrier being approximately 3000 pounds.
8 . The system of claim 7 wherein the unified power source includes a gas turbine.
9 . The system of claim 8 wherein the unified power source includes a first reduction gear coupled to the gas turbine.
10 . The system of claim 9 wherein the unified power source includes a second reduction gear coupled to the first reduction gear.
11 . The system of claim 10 wherein the unified power source includes a hydraulic pump coupled to the second reduction gear.
12 . The system of claim 11 wherein the unified power source includes air compressor coupled to the second reduction gear.
13 . The system of claim 7 wherein the drill carrier includes tracks.
14 . The system of claim 7 wherein the drill carrier includes a driver position.
15 . The system of claim 7 wherein the drill carrier includes a remote control.
16 . A method of seismic line drilling comprising the steps of:
placing a first single-pick drilling system at a first location with a single pick; placing a second single-pick drilling system at a second location with a single pick; when finished drilling, moving the first single-pick drilling system to a third location with a single pick; and when finished drilling, moving the second single-pick drilling system to a fourth location with a single pick.
17 . The method of claim 16 , further comprising the steps of:
placing a third single-pick drilling system at a fifth location with a single pick; and when finished drilling, moving the third single-pick drilling system to a sixth location with a single pick.
18 . A method of seismic line drilling comprising the steps of:
placing a first drill carrier at a first location with a single pick; placing a first single-pick drilling system on the carrier at the first location with a single pick; when finished drilling, moving the first single-pick drilling system to a second location using the carrier; and when meeting an obstacle between drilling locations, moving the first single-pick drilling system to a third location with a single pick; moving the first drill carrier at the third location with a single pick and placing the first single-pick drilling system on the carrier at the third location.Join the waitlist — get patent alerts
Track US2009218142A1 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.