US2009169301A1PendingUtilityA1
Erosion-control structures made with attached sandbags
Est. expiryDec 31, 2027(~1.4 yrs left)· nominal 20-yr term from priority
Inventors:Hun S. Kim
E02B 3/127E02B 3/04E02B 3/14
43
PatentIndex Score
0
Cited by
0
References
0
Claims
Abstract
An erosion-control element for making erosion-control structures comprises a plurality of sandbags attached together by closed-loop attachment members which extend through holes positioned near the bag edges and not connected to the fill-holding chamber in the bag. The erosion-control elements can be used to form structures for protecting underwater shorelines or other ground subject to water erosion.
Claims
exact text as granted — not AI-modified1 . A bag for containing a fill material comprising:
(a) a flexible bag wall forming a chamber for containing said fill material; (b) a sealable opening for insertion of said fill material into said chamber; and (c) a hole adjacent to an edge of said bag extending through said bag wall for receiving a bag attachment member, said hole being unconnected to said chamber.
2 . An erosion-control element comprising:
(a) a plurality of sandbags, each said sandbag having a flexible bag wall forming a chamber containing a fill material, and a hole extending through said bag wall, said hole being unconnected to said chamber; and (b) a bag attachment member extending through said holes forming a closed loop and attaching said sandbags together.
3 . An erosion-control element comprising:
(a) at least three sandbags comprising first, second and third said sandbags, each said sandbag having a flexible bag wall forming a chamber containing a fill material, and a hole extending through said bag wall, said hole being unconnected to said chamber, said first sandbag having at least two said holes spaced apart from each other; (b) a first bag attachment member extending through a first said hole in said first sandbag and through said hole in said second sandbag, forming a closed loop and attaching said first and second sandbags together; and (c) a second bag attachment member extending through a second said hole in said first sandbag and through said hole in said third sandbag, forming a closed loop and attaching said first and third sandbags together.
4 . An erosion-control element comprising:
(a) a plurality of sandbags, each said bag having a flexible bag wall forming a chamber containing a fill material, and a hole extending through said bag wall, said hole being unconnected to said chamber; and (b) each of said holes having a respective bag attachment member extending therethrough and forming a closed loop; and (c) a connector for connecting said bag attachment members together.
5 . An erosion-control element according to claim 2 , wherein said hole is adjacent to an edge of said bag.
6 . An erosion-control element according to claim 3 , wherein said hole is adjacent to an edge of said bag.
7 . An erosion-control element according to claim 4 , wherein said hole is adjacent to an edge of said bag.
8 . An erosion-control element according to claim 2 , wherein said attachment member is a cable tie.
9 . An erosion-control element according to claim 2 , in combination with one or more other said erosion control members to form a structure for protecting a ground area from erosion.
10 . An erosion-control element according to claim 3 , in combination with one or more other said erosion control members to form a structure for protecting a ground area from erosion.
11 . An erosion-control element according to claim 4 , in combination with one or more other said erosion control members to form a structure for protecting a ground area from erosion.
12 . An erosion-control element according to claim 9 , wherein said ground area is an underwater shoreline area.
13 . An erosion-control element according to claim 10 , wherein said ground area is an underwater shoreline area.
14 . An erosion-control element according to claim 11 , wherein said ground area is an underwater shoreline area.
15 . An erosion-control element according to claim 9 , wherein said ground area is an above-water sloping area.
16 . An erosion-control element according to claim 9 , wherein said combination of erosion control members is anchored to said ground area.
17 . An erosion-control element according to claim 10 , wherein said combination of erosion control members is anchored to said ground area.
18 . An erosion-control element according to claim 11 , wherein said combination of erosion control members is anchored to said ground area.Join the waitlist — get patent alerts
Track US2009169301A1 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.