Method for controlling start-up operation of air conditioner
Abstract
A method for controlling a start-up operation of an air conditioner having a compressor and an indoor and an outdoor fan includes the steps of: (a) calculating indoor cooling/heating load; (b) calculating a reference operating frequency of the compressor; (c) driving the indoor and the outdoor fan during a first time period to thereby adjust pressure equilibrium between an indoor and an outdoor pressure; (d) driving the compressor during a preset time period while increasing an operating frequency of the; and (e) setting the operating frequency of the compressor to the reference operating frequency and driving the compressor. The operating frequency of the compressor is increased in a stepwise manner during the preset time period and kept to be lower than the reference operation frequency throughout the preset time period.
Claims
exact text as granted — not AI-modified1 . A method for controlling a start-up operation of an air conditioner having a compressor and an indoor and an outdoor fan, the method comprising the steps of:
(a) calculating indoor cooling/heating load based on an indoor temperature, an outdoor temperature and a difference between the indoor temperature and a target temperature; (b) calculating a reference operating frequency of the compressor by using the calculated indoor cooling/heating load; (c) driving the indoor and the outdoor fan during a first time period to thereby adjust pressure equilibrium between an indoor and an outdoor pressure, when an operation start signal of the air conditioner is inputted; (d) driving the compressor during a preset time period while increasing in a stepwise manner an operating frequency of the compressor, wherein the operating frequency of the compressor is kept to be lower than the reference operation frequency throughout the preset time period; and (e) setting the operating frequency of the compressor to the reference operating frequency and driving the compressor.
2 . The method of claim 1 , wherein the step (a) includes:
(a1) measuring the indoor and the outdoor temperature and calculating the difference between the measured indoor temperature and the target temperature; (a2) determining calibration coefficients for the indoor temperature, for the outdoor temperature and for the temperature difference, respectively, based on preset calibration coefficients; and (a3) calculating the indoor cooling/heating load by using a preset cooling capacity, a preset heating capacity, and the determined calibration coefficients.
3 . The method of claim 1 , wherein the operating frequency of the compressor is set to 0 Hz before driving the indoor and the outdoor fan in step (c).
4 . The method of claim 1 , wherein the step (d) includes:
(d1) setting the operating frequency of the compressor to a first frequency less than the reference operating frequency and driving the compressor during a second time period; (d2) setting the operating frequency of the compressor to a second frequency in a range between the reference operating frequency and the first frequency and driving the compressor during a third time period; and (d3) setting the operating frequency of the compressor to a third frequency in a range between the reference operating frequency and the second frequency and driving the compressor during a fourth time period.
5 . The method of claim 4 , wherein the second frequency is a median between the reference operating frequency and the first frequency.
6 . The method of claim 4 , wherein the third frequency is a median between the reference operating frequency and the second frequency.
7 . The method of claim 4 , wherein each of the first to fourth time period has an identical time duration.
8 . A method for controlling a start-up operation of an air conditioner having a compressor and an indoor and an outdoor fan, the method comprising the steps of:
(a) calculating indoor cooling/heating load based on an indoor temperature, an outdoor temperature and a difference between the indoor temperature and a target temperature; (b) calculating a reference operating frequency of the compressor by using the calculated indoor cooling/heating load; (c) driving the indoor and the outdoor fan during a first time period to thereby adjust pressure equilibrium between an indoor and an outdoor pressure, when an operation start signal of the air conditioner is inputted; (d) setting an operating frequency of the compressor to an initial operating frequency less than the reference operating frequency and driving the compressor during a second time period; (e) setting the operating frequency of the compressor to a median between the reference operating frequency and the current operating frequency and driving the compressor during a third time period; (f) repeating the step (e) by N times where N is a preset value and an integer greater than 1; and (g) setting the operating frequency of the compressor to the reference operating frequency and driving the compressor.
9 . The method of claim 8 , wherein the step (a) includes:
(a1) measuring the indoor and the outdoor temperature and calculating the difference between the measured indoor temperature and the target temperature; (a2) determining calibration coefficients for the indoor temperature, for the outdoor temperature and for the temperature difference, respectively, based on preset calibration coefficients; and (a3) calculating the indoor cooling/heating load by using a preset cooling capacity, a preset heating capacity, and the determined calibration coefficients.
10 . The method of claim 8 , wherein the operating frequency of the compressor is set to 0 Hz before driving the indoor and the outdoor fan in step (c).
11 . The method of claim 8 , wherein each of the first to third time period has an identical time duration.Join the waitlist — get patent alerts
Track US2008028780A1 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.