US2007256516A1PendingUtilityA1
Steel making material recycling system
Individually held — no corporate assignee on recordPriority: Jul 20, 2001Filed: Nov 3, 2006Published: Nov 8, 2007
Est. expiryJul 20, 2021(expired)· nominal 20-yr term from priority
C21C 7/076C21B 3/04Y02W30/50C21C 5/54Y02P10/20C22B 7/02
52
PatentIndex Score
0
Cited by
0
References
0
Claims
Abstract
A steel processing material comprises a dried post combustion material (PCM) and a slag foaming material.
Claims
exact text as granted — not AI-modified1 - 7 . (canceled)
8 . A method of recycling exhaust waste material from an electric arc furnace comprising:
(a) recovering the exhaust waste material from an electric arc furnace; (b) drying the exhaust waste material; (c) adding scrap steel to the electric arc furnace; and (d) adding the exhaust waste material to the electric arc furnace wherein iron from the exhaust waste material is recycled.
9 . The method of recycling the exhaust waste material of claim 8 wherein drying is conducted in a screw auger dryer.
10 . The method of recycling the exhaust waste material of claim 9 wherein the screw auger dryer comprises an induction heater.
11 . The method of recycling the exhaust waste material of claim 9 further comprising sorting the PCM to obtain a fraction having an average particle size processable by the screw auger prior to drying.
12 . The method of recycling the exhaust waste material of claim 11 wherein exhaust waste material is sorted to obtain a fraction having a particle size of about ¾ of an inch.
13 . The method of recycling the exhaust waste material of claim 8 wherein the drying is conducted in a rotary dryer.
14 . The method of recycling the exhaust waste material of claim 8 wherein drying the exhaust waste material comprises drying the exhaust waste material to not greater than about 2% water content.
15 . The method of recycling the exhaust waste material of claim 8 wherein drying the exhaust waste material comprises air drying the exhaust waste material to about 6% to about 8% water content.
16 . The method of recycling the exhaust waste material of claim 8 further comprising sorting the exhaust waste material to obtain a fraction having an average particle size processable by an injection gun.
17 . The method of recycling the exhaust waste material of claim 16 wherein the exhaust waste material is sorted to obtain a fraction having a maximum particle size of about 5/16 of an inch.
18 . The method of recycling the exhaust waste material of claim 8 further comprising conveying the dried exhaust waste material to a first container.
19 . The method of recycling the exhaust waste material of claim 8 further comprising mixing the dried exhaust waste material with a slag foaming material.
20 . The method of recycling the exhaust waste material of claim 19 wherein mixing is conducted by adding the dried exhaust waste material and concurrently adding slag foaming material into a container.
21 . A method of preparing a steel processing material comprising:
(a) recovering dry post combustion material (PCM) from a steel making process; and (b) mixing the PCM with a slag foaming material.
22 . A method of manufacturing steel in an electric arc furnace comprising:
(a) melting in the electric arc furnace a first heat of steel comprising a liquid steel portion and a foamy slag portion; (b) evacuating the emissions from the first ehat wherein solid waste material is exhausted from the heat; mixing the solid waste material with a slag foaming material to form a steel processing material; and (d) adding the steel processing material into a second heat of steel.
23 . The method of manufacturing steel of claim 22 wherein the solid waste material is recovered from the first heat.
24 . The method of manufacturing steel of claim 22 further comprising drying the solid waste material before mixing the solid waste material with a slag foaming material.
25 . The method of manufacturing steel of claim 22 wherein the adding of the steel processing material into a second heat of steel comprises injecting the steel processing material with an injection gun.
26 - 27 . (canceled)
28 . The method of manufacturing steel of claim 23 wherein the steps of melting, drying and adding are repeated until the concentration of heavy metals in the PCM reaches a set point.
29 . The method of manufacturing steel of claim 28 further comprising sending the PCM to a reclamation process once the concentration of heavy metals in the PCM reaches the set point.
30 . The method of manufacturing steel of claim 22 wherein the steps are repeated until the concentration of heavy metals in the solid waste material reaches a set point.
31 . The method of manufacturing steel of claim 30 further comprising sending the PCM to a reclamation process once the concentration of heavy metals in the PCM reaches the set point.Join the waitlist — get patent alerts
Track US2007256516A1 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.