US2007193741A1PendingUtilityA1
Method and Apparatus For Testing And Treatment Of A Completed Well With Production Tubing In Place
Individually held — no corporate assignee on recordPriority: May 9, 2003Filed: Mar 30, 2007Published: Aug 23, 2007
Est. expiryMay 9, 2023(expired)· nominal 20-yr term from priority
Inventors:Peter V. Smith
E21B 19/22E21B 49/087
40
PatentIndex Score
0
Cited by
0
References
0
Claims
Abstract
A method and apparatus is used to test and/or treat individual production zones of a well in conjunction with a conventional coiled tubing unit. This method and apparatus allows testing and treatment of a well with production tubing in place. The return flowpath for formation fluids and/or treatment fluids is through the annulus between the coiled tubing and the production tubing. The preferred embodiment uses straddle packers, but alternative embodiments may use only a single inflatable packer.
Claims
exact text as granted — not AI-modified1 . A method for testing a well with production tubing in place and multiple production zones comprising:
connecting a downhole test assembly to a coiled tubing string, the downhole test assembly having at least one packer; running the coiled tubing string and test assembly through the production tubing and to a depth where the test assembly is adjacent a production zone; setting at least one packer; flowing formation fluid from the production zone up to and out the wellhead, through the test assembly, through the coiled tubing string, and through the annulus between the coiled tubing string and the production tubing; and testing the production zone.
2 . A method for fluid treatment of a well with production tubing in place and multiple production zones comprising:
connecting a downhole treat assembly to a coiled tubing string, the downhole treat assembly having at least one packer; running the coiled tubing string and treat assembly through the production tubing and to a depth where the treat assembly is adjacent a production zone; setting at least one packer; pumping a treatment fluid down through the coiled tubing string and through the treat assembly into a single production zone; and flowing treatment fluid and formation fluid from the production zone up to and out the wellhead, through the treat assembly, through the coiled tubing string, and through the annulus between the coiled tubing string and the production tubing.Join the waitlist — get patent alerts
Track US2007193741A1 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.