A building frame ( 100 ) is designed as multiple assemblages ( 104 ), ( 200 ) and ( 300 ), which are built and then collapsed for shipment in one or more shipping containers ( 400 ), transported to a building site, and removed from the corresponding shipping containers ( 400 ). the assemblages ( 104 ), ( 200 ) and ( 300 ) are constructed as a building frame ( 100 ) at the permanent building site, or, alternatively, are assembled into subassemblies at a temporary building site, and are transferred to the permanent building site.
Claims
exact text as granted — not AI-modified1 . A method of designing a building, comprising the steps of:
designing a building frame to fit in one or more corresponding shipping containers; constructing the building frame assemblage to fold laterally, or vertically, or both laterally and vertically to fit in the one or more corresponding shipping containers; and designing the building frame assemblage to remove vertically from the one or more corresponding shipping containers, and lower onto an construction site.
2 . The method of claim 1 , and further comprising the steps of:
designing the building frame as having separate assemblages in a corresponding shipping container; removing the assemblages from the corresponding shipping container, and constructing the separate assemblages at a building site.
3 . The method of claim 2 , and further comprising the step of:
arranging the separate assemblages in the corresponding shipping container according to the order in which the separate assemblages are removed from the corresponding shipping container.
4 . The method of claim 3 , and further comprising the steps of:
removing the separate assemblages in said order from the corresponding shipping container; constructing the separate assemblages at a temporary building site; and transferring the separate assemblages to a permanent building site.
5 . The method of claim 4 , and further comprising the steps of:
constructing a first story assemblage at the temporary building site; and transferring the first story assemblage to the permanent building site; constructing a second story assemblage at the temporary building site; and transferring the second story assemblage to the permanent building site.
6 . A method of constructing a building frame assemblage packaged for shipment in a shipping container, comprising the steps of:
vertically removing the building frame assemblage that has been folded either vertically or laterally or both vertically and laterally to fit in the shipping container; and lowering the building frame assemblage on a building site in an unfolded configuration.
7 . The method of claim 6 , and further comprising the steps of:
building a floor on the building frame assemblage; and constructing the building frame assemblage and the floor at a permanent building site.
8 . The method of claim 6 , and further comprising the step of: securing the assemblage to the permanent building site.
9 . The method of claim 6 , and further comprising the steps of:
building a floor on the building frame assemblage at a temporary building site; transferring the building frame assemblage and the floor to a permanent building site; and securing the building frame assemblage to the permanent building site.
10 . A method for constructing a building frame assemblage, comprising the steps of:
prefabricating the building frame assemblage in a geographical location where material and labor costs are low; shipping the building frame assemblage by container to a region of the world where buildings and their construction costs are expensive; and transferring the building frame assemblage to a building site.
11 . The method of claim 10 wherein, the step of transferring the building frame assemblage further comprises the step of:
removing the building frame assemblage from a shipping container by a crane.
12 . The method of claim 10 wherein, the step of transferring the building frame assemblage further comprises the steps of:
removing the building frame assemblage from a corresponding container by a crane; and setting the building frame assemblage on a temporary building site; and further comprising the steps of: assembling a floor on the building frame assemblage; and transferring the building frame assemblage and the floor from the temporary building site to a permanent building site.
13 . The method of claim 10 wherein, the step of transferring the building frame assemblage further comprises the steps of:
removing the building frame assemblage from a corresponding container by a crane; and lowering the building frame assemblage on a platform; and further comprising the steps of: assembling a floor on the building frame assemblage; and transferring the building frame assemblage and the floor from the platform to a permanent building site.
14 . The method of claim 10 wherein, the step of transferring the building frame assemblage further comprises the steps of:
removing the building frame assemblage from a corresponding container by a crane; and lowering the building frame assemblage on a permanent building site; and further comprising the step of: assembling a floor on the building frame assemblage.
15 . A building frame comprising:
at least first story frame assemblages; and the assemblages being collapsible to fit in a corresponding shipping container; and the assemblages being arranged according to the order in which they are removed from the corresponding shipping container and used in the construction of a building.
16 . The building frame as recited in claim 15 , and further comprising:
the assemblages being collapsible laterally.
17 . The building frame as recited in claim 15 , and further comprising:
the first story assemblages being cantilever supported at the permanent building site.
18 . The building frame as recited in claim 15 , and further comprising:
second story frame assemblages for building on the first story assemblages; and the second story frame assemblages being collapsible to fit in a corresponding shipping container.
19 . The building frame as recited in claim 15 , and further comprising:
second story frame assemblages for building on the first story assemblages; and roof truss assemblages for building on the second story assemblages; the second story frame assemblages being collapsible to fit in a corresponding shipping container, and the roof truss assemblages being collapsible to fit in a corresponding shipping container.
20 . The building frame as recited in claim 19 , and further comprising:
the assemblages being collapsible laterally.Join the waitlist — get patent alerts